TASK 36-11-47-700-101 HP Bleed Control Air Tubes - Do A Test, Testing-001

DMC:V2500-A0-36-11-4700-00A-364A-C|Issue No:001.00|Issue Date:2013-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 36-11-47-700-101 HP Bleed Control Air Tubes - Do A Test, Testing-001

Effectivity

FIG/ITEM

PART NO.

01-100

6A2136

01-100

6A5391

01-500

6A2139

02-100

6A2140

02-500

6A2138

03-100

6A2137

General

Fig./item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig./item numbers are used. For the service bulletin alpha variants refer to the IPC.

All test pressures referred to in the text are gage pressure.

The Test Equipment Specification

Dry compressed air supply

Air regulator - 0 to 143 psi (0 to 990 kPa)

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NameManufacturerPart Number / IdentificationQuantityRemark
Dry compressed air supplyLOCALDry compressed air supply

0 to 143 psi (0 to 990 kPa)

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 36-11-47-790-001 Do the Leak Test on the HP Bleed Control Air Tube

    2. Connect a Dry compressed air supply to the tube.

    3. Put the tube in to a tank of water and pressurize to 14.5 psi (100 kPa).

    4. Hold the pressure for a minimum of one minute while you examine the tube for signs of leakage, specially at swaged, brazed, welded or repaired areas.

    5. Disconnect the air supply from the tube and remove the tube from the tank.

    6. Dry the tube with dry warm air.

    1. SUBTASK 36-11-47-550-001 Store the HP Bleed Control Air Tube

    2. Put the applicable covers on all openings of the tube and keep it in a clean container to prevent contamination.

Requirements After Job Completion

Follow-On Conditions

NONE
Manufacturer Code:LOCAL
Enterprise Name:LOCALLY SUPPLIED
Manufacturer Code:LOCAL
Tool Number:Dry compressed air supply
Tool Name:Dry compressed air supply