TASK 36-11-49-700-101 Bleed Air Ducts - Do A Test, Testing-001

DMC:V2500-A0-36-11-4900-00A-362A-C|Issue No:002.00|Issue Date:2019-02-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 36-11-49-700-101 Bleed Air Ducts - Do A Test, Testing-001

Effectivity

FIG/ITEM

PART NO.

01-100

740-5060-505

01-300

740-5051-505

01-300

740-5051-507

01-500

740-5059-505

General

Fig/item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig/item numbers are used. For the service bulletin alpha variants refer to the IPC.

The ducts must be cleaned and inspected before this pressure test, refer to Cleaning-000 TASK 36-11-49-100-100 and Refer to Inspection-000 TASK 36-11-49-200-100.

NOTE

Special tools are identified in the procedure by the tool primary number.

Expendable parts

Name

Qty

-

206-393 Seal, Dowty

1

-

206-406 Seal, Dowty

1

-

206-643 Seal, Dowty

1

-

206-655 Seal, Dowty

1

-

AGS 1186-9 Seal

1

The Test Equipment Specification

To do the test on the ducts use equipment equivalent to that shown in Figure and Figure.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NameManufacturerPart Number / IdentificationQuantityRemark
Hydraulic pressure testing rigLOCAL
Pneumatic pressure testing rigLOCAL
6299256-0400 Coupling, AeroquipLOCAL6299256-0400
6299258-0350 Coupling, AeroquipLOCAL6299258-0350
6299258-0350 Coupling, AeroquipLOCAL6299258-0350
AGS 3013/B Pressurising UnionLOCALAGS 3013/B
IAE 1N20419 Pressurising adapter0AM53IAE 1N20419

1

IAE 1N20422 Blanking adapter0AM53IAE 1N20422

2

IAE 1N20423 Pressurising adapter0AM53IAE 1N20423

1

IAE 1N20434 Blanking adapter0AM53IAE 1N20434

1

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 36-11-49-780-051 Prepare the Ducts (01-100, 01-300 and 01-500) for the Hydraulic Pressure Test

    2. Install the IAE 1N20419 Pressurising adapter and the 206-406 dowty seal 1off to the duct (01-100). Safety the components with an applicable aeroquip coupling.

    3. Install the IAE 1N20422 Blanking adapter and the 206-655 dowty seal 1off to the duct (01-100). Safety the components with an applicable aeroquip coupling.

    4. Install the AGS 3013/B Pressurising Union and the AGS 1186-9 seal 1 off to the duct (01-300). Safety the components with an applicable aeroquip coupling.

    5. Install the IAE 1N20434 Blanking adapter and the 206-393 (dowty seal) 1 off to the duct (01-300). Safety the components with an applicable aeroquip coupling.

    6. Install the IAE 1N20422 Blanking adapter and 206-655 dowty seal 2 off to the duct (01-300). Safety the components with an applicable aeroquip coupling.

    7. Install the IAE 1N20423 Pressurising adapter and the 206- 643 dowty seal 1off to the duct (01-500). Safety the components with an applicable aeroquip coupling.

    8. Install the IAE 1N20422 Blanking adapter and the 206-655 dowty seal 1 off to the duct (01-500). Safety the components with an applicable aeroquip coupling.

    1. SUBTASK 36-11-49-780-052 Do the Hydraulic Pressure Test on the Ducts (01-100, 01-300 and 01-500)

    2. Connect the duct to the outlet of the hydraulic pressure testing rig.

    3. Make sure that the bleed screw is at the highest position and open.

    4. Make sure that the pressure control valve is set to zero.

    5. Start the hydraulic pressure testing rig.

    6. Slowly turn the pressure control valve until the fluid comes out of the bleed valve.

    7. Close the bleed valve.

    8. CAUTION

      DO NOT GO PAST THE TEST PRESSURE SHOWN BELOW. IT CAN CAUSE DAMAGE TO THE DUCT. IF THE PRESSURE IN THE DUCT GETS TO MORE THAN THAT SHOWN BELOW, REJECT THE DUCT.

      Increase the pressure in the duct (01-100) to 195 psi (1345 kPa).

    9. Increase the pressure in the duct (01-300) to 468 psi (3227 kPa).

    10. Increase the pressure in the duct (01-500) to 504 psi (3475 kPa).

    11. Let the pressure stay in the upper and lower duct assemblies (01-100 and 01-500) for 2 minutes and the Y-intersection duct assembly (01-300) for 1 minute.

    12. Make sure that the duct has no leaks. If the duct has leaks, reject the duct, refer to TASK 36-11-49-200-100.

    13. Decrease the pressure in the duct to zero.

    14. Stop the hydraulic pressure testing rig.

    15. Open the bleed screw.

    16. Disconnect the duct from the outlet of the hydraulic pressure testing rig.

    17. Remove the couplings, the adapters and the seals from the duct.

    18. WARNING

      BE CAREFUL WHEN YOU USE COMPRESSED AIR. PUT ON PROTECTIVE CLOTHING AND GOGGLES.

      Remove unwanted fluid from the duct with clean, dry compressed air.

    1. SUBTASK 36-11-49-780-053 Prepare the Ducts (01-100, 01-300 and 01-500) for the Pneumatic Pressure Test

    2. Do again the procedure to prepare the ducts for the pneumatic pressure test, refer to Step.

    1. SUBTASK 36-11-49-780-054 Do the pneumatic pressure-test on the ducts (01-100, 01-300 and 01-500)

    2. Make sure that the bleed screw is closed.

    3. Connect the duct to the outlet of the pneumatic pressure-testing rig.

    4. Put a pressure of 14.5 psi (100 kPa) in the duct.

    5. Put the duct in the water tank.

    6. Let the pressure stay in the duct for 1 minute.

    7. Make sure that the duct has no leaks. If the duct has leaks, reject the duct, refer to Inspection-000 TASK 36-11-49-200-100.

    8. Decrease the pressure in the duct to zero.

    9. Disconnect the duct from the outlet of the pneumatic pressure testing rig.

    10. Remove the couplings, the adapters and the seals from the duct.

  1. Figure: Hydraulic Pressure Testing Rig

    Hydraulic Pressure Testing Rig

    Figure: Pneumatic Pressure Testing Rig

    Pneumatic Pressure Testing Rig

Requirements After Job Completion

Follow-On Conditions

NONE
Change Type:

Revised the effectivity table and step. (7049-CV17-7786)

Change Type:

Revised subtask 36-11-46-780-054 to 36-11-49-780-054. (Editorial)

Manufacturer Code:0AM53
Enterprise Name:IAE INTERNATIONAL AERO ENGINES AG
BU Name:NULL
Building:SUITE 400
Street:628 HEBRON AVENUE
City:GLASTONBURY
State:CT
Zip Code:06033
Country:USA
Manufacturer Code:LOCAL
Enterprise Name:LOCALLY SUPPLIED
Link not Found
Link not Found
Manufacturer Code:LOCAL
Tool Number:AGS 3013/B
Tool Name:AGS 3013/B Pressurising Union
Manufacturer Code:0AM53
Tool Number:IAE 1N20419
Tool Name:IAE 1N20419 Pressurising adapter
Manufacturer Code:0AM53
Tool Number:IAE 1N20422
Tool Name:IAE 1N20422 Blanking adapter
Manufacturer Code:0AM53
Tool Number:IAE 1N20423
Tool Name:IAE 1N20423 Pressurising adapter
Manufacturer Code:0AM53
Tool Number:IAE 1N20434
Tool Name:IAE 1N20434 Blanking adapter
Link not Found