DMC:V2500-A0-72-00-3200-07A-520A-BIssue No:001.00Issue Date:2014-05-01
Export Control
EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 72-00-32-560-001 LPC/Intermediate Case Module - Turn The LPC/Intermediate Case Module From Horizontal To Vertical, Removal-007
General
All the bolts, the nuts and the washers referred in this TASK are part of the special tools.
NOTE
Special tools are identified in the procedure by the tool primary number.
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| IAE 1F10051 Two cable sling | 0AM53 | IAE 1F10051 | 1 | |
| IAE 1J12010 Storage stand | 0AM53 | IAE 1J12010 | 1 | |
| IAE 1J13003 Turnover bracket | 0AM53 | IAE 1J13003 | 1 |
Consumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Attach IAE 1J13003 Turnover bracket 1 off on to the front flange of the LP compressor/intermediate case module.
Install IAE 1F10051 Two cable sling 1 off on to the LP compressor/intermediate case module.
SUBTASK 72-00-32-560-057 Install the Sling Tools on to the LP Compressor/Intermediate Case Module
NOTE
Operate the two hoists equally at the same time to keep the LP compressor/intermediate case module horizontal. Move the LP compressor/intermediate case module away from the pedestals fully.Slowly lift the LP compressor/intermediate case module with the two hoists until it is clear of the pedestals.
SUBTASK 72-00-32-560-058 Lift and Turn the LP Compressor/Intermediate Case Module to Vertical
Refer to Figure.
Put IAE 1J12010 Storage stand 1 off below the LP compressor/intermediate case module.
SUBTASK 72-00-32-560-059 Prepare for Installation of the LP Compressor/Intermediate Case Module on to the Storage Stand
Refer to Figure.
SUBTASK 72-00-32-560-061 Remove the Sling Tools from the LP Compressor/Intermediate Case Module
Figure: Install/remove the rear bracket, the rear trunnion and the two cable sling
Install/remove the rear bracket, the rear trunnion and the two cable sling

Figure: Install/remove the turnover bracket and the front bracket and lift LP compressor intermediate case module
Install/remove the turnover bracket and the front bracket and lift LP compressor intermediate case module

Figure: Turn the LP compressor/intermediate case module to vertical
Turn the LP compressor/intermediate case module to vertical