TASK 72-32-38-700-101 No. 1 Bearing Compartment Rear Seal Drain Tube - Do A Test, Testing-001

DMC:V2500-A0-72-32-3800-00A-364A-C|Issue No:001.00|Issue Date:2014-05-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 72-32-38-700-101 No. 1 Bearing Compartment Rear Seal Drain Tube - Do A Test, Testing-001

Effectivity

FIG/ITEM

PART NO.

01-200

5A1351

General

Fig/item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig/item numbers are used. For the service bulletin alpha variants refer to the IPC.

All test pressures referred to in the text are gage pressure.

NOTE

Special tool is identified in the procedure by the tool primary number.

The Test Equipment Specification

Dry compressed air supply

Air regulator - 0 to 143 psi (0 to 990 kPa)

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NameManufacturerPart Number / IdentificationQuantityRemark
Dry compressed air supplyLOCALDry compressed air supply
IAE 2J12615 Fixture0AM53IAE 2J126151 off

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 72-32-38-790-051 Do the Leak Test on the Flanged Seal Drain Tube Assembly

    2. Attach IAE 2J12615 Fixture 1 off to the tube.

    3. Connect Dry compressed air supply to the fixture on the tube.

    4. Put the tube in to a tank of water and pressurize to 14.5 psi (100 kPa).

    5. Hold the pressure for a minimum of one minute while you examine the tube for signs of leakage, specially at swaged, brazed, welded, or repaired areas.

    6. Isolate the air supply, release the pressure and remove the tube from the tank.

    7. Remove the fixture and dry the tube with dry warm air.

    1. SUBTASK 72-32-38-550-051 Store the Flanged Seal Drain Tube Assembly

    2. Put applicable covers on all openings of the tube and keep it in a clean container to prevent contamination.

Requirements After Job Completion

Follow-On Conditions

NONE
Manufacturer Code:0AM53
Enterprise Name:IAE INTERNATIONAL AERO ENGINES AG
BU Name:NULL
Building:SUITE 400
Street:628 HEBRON AVENUE
City:GLASTONBURY
State:CT
Zip Code:06033
Country:USA
Manufacturer Code:LOCAL
Enterprise Name:LOCALLY SUPPLIED
Manufacturer Code:LOCAL
Tool Number:Dry compressed air supply
Tool Name:Dry compressed air supply
Manufacturer Code:0AM53
Tool Number:IAE 2J12615
Tool Name:IAE 2J12615 Fixture