TASK 75-24-51-100-405 Active Clearance Control (ACC) Valve - Related Parts - Clean The Bushings, Cleaning-005

DMC:V2500-A0-75-24-5100-04A-251A-C|Issue No:001.00|Issue Date:2013-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 75-24-51-100-405 Active Clearance Control (ACC) Valve - Related Parts - Clean The Bushings, Cleaning-005

Effectivity

FIG/ITEM

PART NO.

01-190

5W2059

01-200

5W2087

01-210

5W2059

01-470

5W2059

01-555

5W2061

02-130

5W2059

02-160

5W2059

02-310

5W2059

02-380

5W2059

General

This TASK gives the procedure to clean the reamer bolt. For other active clearance control valve parts, refer to Cleaning-000 TASK 75-24-51-100-400.

The practices and processes referred to in the procedure by the TASK/SUBTASK numbers are in the SPM.

Fig/item numbers in parentheses in the procedure agree with those used in the EIPC. Only the primary Fig/item numbers are used. For the service bullletin alpha variants refer to the EIPC.

NOTE

Consumable materials are given in the related SPM TASK.

Reference

Refer to the SPM for data on these items.

Cleaning Policy and Methods, SPM TASK 70-10-00-100-501.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 75-24-51-110-055 Chemically Clean the Bushes

    2. Clean the bushes. Refer to SPM TASK 70-11-01-300-503.

      1. Dry

      2. Clean dry air blast.

Requirements After Job Completion

Follow-On Conditions

NONE