TASK 75-32-52-100-103 HPC Stage 7 Bleed Outlet Duct And Seal Assembly Remaining Parts - Clean, Cleaning-003

DMC:V2500-A0-75-32-5205-00A-251A-C|Issue No:001.00|Issue Date:2013-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 75-32-52-100-103 HPC Stage 7 Bleed Outlet Duct And Seal Assembly Remaining Parts - Clean, Cleaning-003

Effectivity

FIG/ITEM

PART NO.

VARIOUS

BOLT

VARIOUS

NUT

General

This TASK gives the procedure to clean the HPC stage 7 bleed valve remaining parts.

The practices and processes referred to in the procedure by the TASK/SUBTASK numbers are in the SPM.

Reference

Refer to the SPM for data on these items:

Cleaning Policy and Methods, SPM TASK 70-10-00-100-501.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 75-32-52-110-053-001 Remove the Grease

      1. Clean the parts. Refer to SPM TASK 70-11-01-300-503.

      2. Vapor degrease

    1. SUBTASK 75-32-52-110-053-002 Remove the Grease

      1. Clean the parts. Refer to SPM TASK 70-11-03-300-503.

      2. Mild clean

Requirements After Job Completion

Follow-On Conditions

NONE