EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 79-11-41-700-401 Oil Tank - Related Parts - Do A Test On The Oil Tank, Testing-001
Effectivity
FIG/ITEM | PART NO. |
|---|---|
01-001 | 4A7001 |
01-001 | 4A7002 |
01-001 | 4A7003 |
01-001 | 4A7003R |
01-001 | 4A7004-01 |
01-001 | 4A7004-01F |
General
Fig/item numbers in parentheses in the procedure agree with those used in the IPC. Only primary Fig/item numbers are used. For the service bulletin alpha variants refer to the IPC.
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| Dry compressed air supply | LOCAL | Dry compressed air supply |
Consumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Install (79-11-41,01-058) packing 1 off to the tank mating flange.
Install a suitable blanking cover on the tank mating flange.
Install a suitable blanking cover on the scavenge oil flange.
Install a suitable blanking cover on the oil tank valve boss.
Install a suitable blanking cover on the spill adapter.
Blank all the ports as follows:
Connect the Dry compressed air supply tube to the blanking cover fixture on the tank mating flange.
Put the oil tank in to a tank of water and pressurized the tank to 17 psi (0.117 Mpa).
Hold the pressure for a minimum of one minute.
Make sure that the oil tank has no leaks. If the oil tank has leaks, reject.
Decrease the pressure in the oil tank to zero, and remove the air supply tube.
Dry the oil tank with dry air and remove the blanks cover and the packing.
SUBTASK 79-11-41-790-051 Do a Leak Test on the Oil Tank