Export Control
EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 79-21-49-700-102 Engine Pressure Oil Tubes - Do A Pressure Test, Testing-002
General
Fig/item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig/item numbers are used. For the service bulletin alpha variants refer to the IPC.
All test pressures referred to in the procedure are gage pressure.
The Test Equipment Specification
Dry compressed air supply
Air regulator - 0 to 143 psi (0 to 990 KPa)
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| Dry compressed air supply | LOCAL | Dry compressed air supply | ||
| IAE 2J13307 Adapter | 0AM53 | IAE 2J13307 | 1 | |
| IAE 2J13308 Adapter | 0AM53 | IAE 2J13308 | 1 |
Consumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Attach special adapter to the tubes.
Connect a dry compressed air supply to the tube.
Put the tube in to a tank of water and pressurize to 14.5 psi (100 KPa).
Hold the pressure for a minimum of one minute while you examine the tube for signs of leakage, specially at swaged, brazed welded or repaired areas.
Isolate the air supply, release the pressure and remove the tube from the tank.
Dry the tube with dry warm air.
The tubes (11-100 and 13-100) require special adapters on their tube end to connect to a dry compressed air supply. IAE 2J13307 Adapter for tube (11-100) and IAE 2J13308 Adapter for tube (13-100). Other tubes (10-100 and 12-100) do not require a special adapter.
SUBTASK 79-21-49-790-051 Do the Leak Test on the Pressure Oil Tube Assembly
Put applicable covers on all openings of the tube and keep it in a clean container to prevent contamination.
SUBTASK 79-21-49-550-052 Store the Pressure Oil Tube Assembly
