TASK 72-32-57-100-101 No. 1 Bearing Compartment Air Tube - Clean, Cleaning-001

DMC:V2500-A1-72-32-5700-00A-251A-C|Issue No:001.00|Issue Date:2013-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 72-32-57-100-101 No. 1 Bearing Compartment Air Tube - Clean, Cleaning-001

Effectivity

FIG/ITEM

PART NO.

01-100

5R0233

01-100

5R0240

General

This TASK gives the procedure to clean the No.1 bearing compartment air tube.

The practices and processes referred to in the procedure by the TASK number are in the SPM.

Fig/item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig/item numbers are used. For the service bulletin alpha variants refer to the IPC.

NOTE

Consumable materials are given in SPM TASK 70-11-03-300-503.

Reference

Refer to SPM TASK 70-10-00-100-501, Cleaning - General Information.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 72-32-57-110-051 Clean the No.1 Bearing Compartment Air Tubes

    2. Clean, Refer to SPM TASK 70-11-03-300-503.

      1. Dry

      2. Dry air blast

Requirements After Job Completion

Follow-On Conditions

NONE