TASK 70-33-79-200-502 Testing Of Solutions Used For Stripping Of Plasma And Flame Plate Coating

DMC:V2500-00-70-33-79-00A-300A-D|Issue No:001.00|Issue Date:2013-03-20

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 70-33-79-200-502 Testing Of Solutions Used For Stripping Of Plasma And Flame Plate Coating

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

WARNING

IT IS THE RESPONSIBILITY OF THE OPERATOR TO OBTAIN AND OBSERVE THE MANUFACTURERS MATERIAL SAFETY DATA SHEETS FOR CONSUMABLE MATERIALS INFORMATION SUCH AS, HAZARDOUS INGREDIENTS, PHYSICAL/CHEMICAL CHARACTERISTICS, FIRE, EXPLOSION, REACTIVITY, HEALTH HAZARD DATA, PRECAUTIONS FOR SAFE HANDLING, USE AND CONTROL MEASURES AND ALSO TO TAKE LOCAL REGULATIONS INTO CONSIDERATION.

WARNING

Refer to the SPM TASK 70-11-47-110-501 for specific precautions.

Procedure

    1. SUBTASK 70-33-79-200-002 Testing the Molten Salt Bath (Solution Code 38)

    2. Refer to Test Procedure P-59, Descaling Salt Bath in the SPM TASK 70-11-47-110-501 SUBTASK 70-11-47-180-026 to test Solution Code 38.

Requirements After Job Completion

Follow-On Conditions

NONE