EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 70-37-29-370-501 Stress-Relief Cycle 12
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
NONESpares
NONESafety Requirements
WARNING
IT IS THE RESPONSIBILITY OF THE OPERATOR TO OBTAIN AND OBSERVE THE MANUFACTURER'S MATERIAL SAFETY DATA SHEETS FOR CONSUMABLE MATERIALS. THESE CONTAIN INFORMATION SUCH AS, HAZARDOUS INGREDIENTS, PHYSICAL/CHEMICAL CHARACTERISTICS, FIRE, EXPLOSION, REACTIVITY, HEALTH HAZARD DATA, PRECAUTIONS FOR SAFE HANDLING, USE AND CONTROL MEASURES AND ALSO TO TAKE LOCAL REGULATIONS IN TO CONSIDERATION.
Procedure
NOTE
To minimize distortion, you can increase and decrease temperatures slowly as in Cycle 12A in the SPM TASK 70-37-01-370-501.Increase the temperature of the part to 1325 to 1375 deg F (718 to 746 deg C) and hold for four hours. Air is a permitted atmosphere. Temperature increase rate is optional.
Decrease the temperature of the part to 1175 to 1225 deg F (635 to 663 deg C) at a rate approximately 125 deg F (70 deg C) maximum for each hour and hold for a time which, together with the temperature decrease time from 1350 deg F (732 deg C), totals three hours. Subsequent temperature decrease rate is optional.
SUBTASK 70-37-29-370-001 Stress-Relief Cycle 12