TASK 72-44-50-200-000 HPT Stage 1 Cooling (TOBI) Duct And Duct Deflector - The Table Of Part Numbers/Task Numbers, Inspection-000

DMC:V2500-A0-72-44-5000-00A-310A-C|Issue No:001.00|Issue Date:2013-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 72-44-50-200-000 HPT Stage 1 Cooling (TOBI) Duct And Duct Deflector - The Table Of Part Numbers/Task Numbers, Inspection-000

General

The part number table gives the breakout, configuration and TASK number where the applicable data for a part is given. It is given to find the part number only

Before starting a procedure, refer to EFFECTIVITY statement contained in each TASK to make sure of the approved procedure part number applicability

FIG/ITEM

PART NO.

BREAKOUT

CONFIG

TASK NO.

01-010

2A0008-01

01

01

01-010

2A1997-01

01

02

01-010

2A1997-001

01

02

01-010

2A1997-002

01

02

01-010

2A1997-003

01

02

01-010

2A2141-01

01

03

01-010

2A3180-01

01

06

01-080

2A0086

02

01

01-010

2A3329-01

01

05

01-010

2A3487-01

01

06

01-010

2A3487-001

01

07

01-010

2A3491-01

01

05

01-010

2A3914-01

01

07

01-010

2A3914-001

01

07

01-010

2A4086

01

07

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

Requirements After Job Completion

Follow-On Conditions

NONE