TASK 75-23-49-100-101 Turbine Cooling Air (TCA) Supply Air Tubes - Clean, Cleaning-001

DMC:V2500-A0-75-23-4900-03A-251A-C|Issue No:001.00|Issue Date:2014-05-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 75-23-49-100-101 Turbine Cooling Air (TCA) Supply Air Tubes - Clean, Cleaning-001

Effectivity

FIG/ITEM

PART NO.

01-100

2A1492

01-500

2A0711

02-100

2A0749

02-500

2A1493

General

This TASK gives the procedure to clean the PS3 cooling air tube. For the other turbine cooling controlled air tube parts, refer to Cleaning-000TASK 75-23-49-100-100 and Cleaning-000 in the Component Maintenance Manual (CMM-MECH-V2500-1IA).

Fig./item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig./item numbers are used. For the service bulletin alpha variants refer to the IPC.

The practices and processes referred to in the procedure by the TASK numbers are in the SPM.

NOTE

The consumable materials are given in the related SPM TASK.

References

Refer to General Cleaning, Section 70-10-00, in the Standard Practices Manual (SPM) for important cleaning information that supplements the TASKs.

When more than one TASK or SUBTASK is specified for a part, refer to Section 70-10-00 in the SPM for selection of the applicable cleaning TASK or SUBTASK.

Refer to Section 70-11-00 in the SPM for the TASK number given below.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 75-23-49-110-052 Remove the Grease and Oil from the TCA Supply Tubes

      1. Remove grease and oil from the tubes Refer to SPM .TASK 70-11-03-300-503.

      2. Degrease Parts by Aqueous Cleaning.

    1. SUBTASK 75-23-49-110-059 Remove the Carbon from the TCA Supply Tubes

      1. Remove the carbon from the tubes Refer to SPM .TASK 70-11-13-300-503.

      2. Cleaning of Components (Long Soak, for Cobalt and Nickel Based Alloys and Heat and Non- Corrosion Resistant Steels).

Requirements After Job Completion

Follow-On Conditions

NONE