TASK 75-24-49-100-102 LPT ACC Periseal Clamp - Clean, Cleaning-002

DMC:V2500-A0-75-24-4903-00A-251A-C|Issue No:001.00|Issue Date:2013-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 75-24-49-100-102 LPT ACC Periseal Clamp - Clean, Cleaning-002

Effectivity

FIG/ITEM

PART NO.

01-570

3A0185

01-670

3A0185

02-590

3A0948

General

This TASK gives the procedure to clean the clamps of the ACC.

The practices and processes referred to in the procedure by the TASK number are in the SPM.

Fig/item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig/item numbers are used.

NOTE

Consumable materials are given in the SPM TASK 70-11-01-300-503 and SPM TASK 70-11-13-300-503.

Reference

Refer to SPM for data on these items.

Cleaning Policy and Methods, Refer to SPM TASK 70-10-00-100-501.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 75-24-49-110-052-001 Clean the Retaining Clamp and the Half Loop Clamp of the ACC

      1. Clean the retaining clamp and the half loop clamp. Refer to SPM TASK 70-11-01-300-503.

      2. Vapor degrease.

    1. SUBTASK 75-24-49-110-052-002 Clean the Retaining Clamp and the Half Loop Clamp of the ACC

      1. Clean the retaining clamp and the half loop clamp. Refer to SPM TASK 70-11-13-300-503.

      2. Cleaning of components (Long soak, for Cobalt and Nickel base alloys and heat and corrosion resistant steels).

Requirements After Job Completion

Follow-On Conditions

NONE