TASK 79-21-43-100-405 Fuel Cooled Oil Cooler (FCOC) - Related Parts - Clean The Link, Cleaning-005

DMC:V2500-A0-79-21-4300-04A-251A-C|Issue No:001.00|Issue Date:2013-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 79-21-43-100-405 Fuel Cooled Oil Cooler (FCOC) - Related Parts - Clean The Link, Cleaning-005

Effectivity

FIG/ITEM

PART NO.

01-580

5T8077

01-580

5T8076

General

This TASK gives the procedure to clean the link. For the other parts of the fuel cooled oil cooler, refer to Cleaning-000 TASK 24-21-43-100-400.

The practices and processes referred to in the procedure by the TASK number are in the SPM.

Fig/Item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig/Item numbers are used. For the service bulletin alpha variants refer to the IPC.

References

Refer to the SPM for data on these items.

Cleaning Policy, SPM TASK 70-10-00-100-501.

Cleaning Methods, SPM TASK 70-10-00-100-501.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 79-21-43-110-055 Clean the Link

      1. Clean. Refer to SPM TASK 70-11-26-300-503.

      2. Locally Swab or Wipe.

      1. Dry

      2. Dry air blast.

Requirements After Job Completion

Follow-On Conditions

NONE