TASK 72-32-00-030-007-A00 LPC/Intermediate Case Module - Remove The LPC Stage 2.5 Vanes, Disassembly-007

DMC:V2500-A1-72-32-0000-07A-530A-B|Issue No:001.00|Issue Date:2014-05-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

V2500-A1

Common Information

TASK 72-32-00-030-007-A00 LPC/Intermediate Case Module - Remove The LPC Stage 2.5 Vanes, Disassembly-007

General

Fig/item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig/item numbers are used. For the service bulletin alpha variants refer to the IPC.

Apply the approved penetrating oil before the removal if threaded parts. Let the parts soak before removal. For the approved oils and procedures, refer to SPM TASK 70-64-00-640-501.

The number for each radial location must be identified in a clockwise direction. These start at the engine top position when you look from the rear of the engine, unless stated differently in the procedure.

The No.1 strut, which is the top position strut of the fan frame assembly, is identified by the five pressure tubes on the No.1 strut leading edge.

This TASK gives the procedure to remove the LP compressor stage 2.5 vanes and the rear fairing.

NOTE

Special tools are identified in the procedure by the tool primary number.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NameManufacturerPart Number / IdentificationQuantityRemark
IAE 1J12188 Puller bolt0AM53IAE 1J121881
IAE 1J13104 Vertical sling0AM53IAE 1J131041

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 72-32-00-030-115 Remove the LP Compressor Stage 2.5 Vanes from the Fan Frame Assembly

    2. Refer to Figure and Figure.

    3. Remove the 25 bolts and bushes which attach the stage 2.5 vanes to the booster stage bleed valve and actuating mechanism.

    4. Remove the 18 bolts and washers which attach the stage 2.5 vanes to the fan frame assembly.

      1. Use the three puller bolts (part of IAE 1J12188 Puller bolt 1 off) to release the stage 2.5 vanes from the fan frame assembly.

      2. Install the puller bolts in to the three threaded holes in the stage 2.5 vanes.

      3. Tighten the three puller bolts equally until the stage 2.5 vanes is released from the fan frame assembly.

      4. Remove the puller bolts from the threaded holes in the stage 2.5 vanes.

    5. Attach a hoist to IAE 1J13104 Vertical sling 1 off.

      1. Install the vertical sling to the stage 2.5 vanes.

      2. Install the three eye bolts (part of the vertical sling) in to the three of the 49 clinch nuts of the stage 2.5 vanes. The three eye bolts must be installed at approximately 120 degrees apart from each other.

      3. Connect the vertical sling to the eye bolts with the three shackles (part of the vertical sling).

    6. Lift and remove the stage 2.5 vanes from the fan frame assembly. Put the stage 2.5 vanes on to a work bench.

      1. Remove the vertical sling from the stage 2.5 vanes.

      2. Remove the three shackles which attach the vertical sling to the eye bolts on the stage 2.5 vanes.

      3. Remove the three eye bolts from the clinch nuts of the stage 2.5 vanes.

  1. Figure: Release the LP compressor stage 2.5 vanes from the booster stage bleed valve and actuating mechanism

    Release the LP compressor stage 2.5 vanes from the booster stage bleed valve and actuating mechanism

    Figure: Remove the LP compressor stage 2.5 vanes

    Remove the LP compressor stage 2.5 vanes

Requirements After Job Completion

Follow-On Conditions

NONE
Manufacturer Code:0AM53
Enterprise Name:IAE INTERNATIONAL AERO ENGINES AG
BU Name:NULL
Building:SUITE 400
Street:628 HEBRON AVENUE
City:GLASTONBURY
State:CT
Zip Code:06033
Country:USA
Manufacturer Code:0AM53
Tool Number:IAE 1J12188
Tool Name:IAE 1J12188 Puller bolt
Manufacturer Code:0AM53
Tool Number:IAE 1J13104
Tool Name:IAE 1J13104 Vertical sling