EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
V2500-A1
Common Information
TASK 72-50-10-030-007-A00 LPT Case And Rotor Assembly - Disassemble The LPT Stage 5 Stator Vanes From The LPT, Disassembly-007
General
Fig/item numbers in the procedure agree with those used in the IPC. Only the primary Fig/item numbers are used. For the service bulletin alpha variants refer to the IPC.
Apply the approved penetrating oil before the removal of threaded parts. Let the parts soak before removal. For the approved oils and procedures, refer to the SPM TASK 70-64-00-640-501.
Discard all rubber seal rings, cotter pins and keywashers removed in this procedure.
Refer to TASK 72-50-00-990-501 (DESCRIPTION AND OPERATION-001) for a sectional view of the LP turbine module.
NOTE
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| Electronic balance crane | LOCAL | Electronic balance crane | ||
| Basket | LOCAL | Basket | for blades and vanes | |
| Lifting sling | LOCAL | Lifting sling | ||
| Rack pallet | LOCAL | Rack pallet | ||
| IAE 1M14042 Tilting plate | 0AM53 | IAE 1M14042 | 1 | |
| IAE 1M14056 Lifting shaft | 0AM53 | IAE 1M14056 | 1 | |
| IAE 1M14063 Guide fixture | 0AM53 | IAE 1M14063 | 1 | |
| IAE 1M14072 Mounting plate | 0AM53 | IAE 1M14072 | 1 | |
| IAE 1M14073 Lifting fixture | 0AM53 | IAE 1M14073 | 1 | |
| IAE 1M14119 Protector ring segment | 0AM53 | IAE 1M14119 | 3 | |
| IAE 1M14130 Removal puller | 0AM53 | IAE 1M14130 | 1 | |
| IAE 1M14010 Assembly/Disassembly fixture | 0AM53 | IAE 1M14010 |
Consumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Refer to: Figure
Install the IAE 1M14119 Protector ring segment 3 off between the stage 5 vane inner platforms and the stage 4 blade roots.
SUBTASK 72-50-10-030-146 Install the Protector Ring Segments
Refer to: Figure
Install the IAE IAE 1M14056 Lifting shaft 1 off into the IAE 1M14063 Guide fixture 1 off.
SUBTASK 72-50-10-030-155 Install the Lifting Shaft in to the Guide Fixture
Refer to: Figure
Install the IAE IAE 1M14042 Tilting plate 1 off on to the lifting shaft.
SUBTASK 72-50-10-030-156 Install the Tilting Plate on to the Lifting Shaft
Refer to: Figure
Loosen the shroud seal segments with the IAE IAE 1M14130 Removal puller 1 off.
SUBTASK 72-50-10-030-095 Remove the Shroud Seal Segments of the Stage 5
Refer to: Figure
NOTE
Make sure that the rear hub hooks from all vanes become free from the groove in the turbine case.
SUBTASK 72-50-10-030-096 Prepare the Stage 5 Vane Assembly for Removal
Refer to: Figure
SUBTASK 72-50-10-030-157 Remove the Tilting Plate and the Lifting Shaft
Refer to Fig. 72-50-10-990-152 and Figure.
Use hoist equipment. Lift the IAE 1M14073 Lifting fixture 1 off above the LP turbine case and rotor.
SUBTASK 72-50-10-030-097 Install the Lifting Fixture
Refer to: Figure
Attach hoist equipment on to electronic balance crane. Lift the electronic balance crane above the LP turbine case and rotor. Attach the IAE 1M14073 Lifting fixture 1 off to the electronic balance crane. Use lifting sling.
Put the stage 5 vane assembly on to the IAE 1M14072 Mounting plate 1 off.
SUBTASK 72-50-10-030-098 Remove the Stage 5 Vane Assembly
Refer to: Figure
SUBTASK 72-50-10-030-099 Remove the Stage 5 Heatshield
Refer to: Figure
SUBTASK 72-50-10-030-147 Remove the Protector Ring Segments
Place the lifting ring of the IAE 1M14010 Assembly/Disassembly fixture 1 off from the 'lifting-position' into the 'zero-position' with the use of the lever.
SUBTASK 72-50-10-030-191 Move the Lifting Ring
Figure: Remove the Stage 5 Vanes
Remove the Stage 5 Vanes

Figure: Install the Lifting Shaft and the Tilting Plate
Install the Lifting Shaft and the Tilting Plate

Figure: Correct Installation of the Hooks of the Lifting Fixture
Correct Installation of the Hooks of the Lifting Fixture