Export Control
EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 72-32-21-200-001-B00 No. 3 Bearing Housing Shoulder Stud - Examine, Inspection-001
General
This TASK gives the procedure for the inspection of the shoulder stud.
Fig/item numbers in parentheses in the procedure agree with those used in the IPC.
The policy that is necessary for inspection is given in the SPM TASK 70-20-00-200-501. For the other parts of the No. 3 bearing housing, refer to TASK 72-32-21-200-000 (INSPECTION-000).
All the parts must be cleaned before any part is examined. Refer to TASK 72-32-21-100-000 (CLEANING-000).
All parts must be visually examined for damage, corrosion and wear. Any defects that are not identified in the procedure must be referred to IAE.
See the procedure section for instructions on performing crack test. Do the test before the part is visually examined. If one stud in a set has cracks, you must reject the entire set of studs.
A ** following repair referenced in this inspection indicates that the repair is not yet published in the current revision of the manual and the part must be rejected. Contact IAE for additional information concerning FAA approved repair date.
Do not discard any part until you are sure there are no repairs available. Refer to the instructions in Repair before a discarded part is used again or oversize parts are installed.
Parts which should be discarded can be held although no repair is available. The repair of a discarded part could be shown to be necessary at a later date.
All parts must be examined to make sure that all the repairs have been completed satisfactorily.
The practices and processes referred to in the procedure by the TASK numbers are in the SPM.
References
Refer to the SPM for data on these items.
Definitions of Damage, SPM TASK 70-02-02-350-501.
Inspection of Parts, SPM TASK 70-20-00-200-501.
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Clean the part. Refer to TASK 72-32-21-100-000 (CLEANING-000).
SUBTASK 72-32-21-230-053-001 Examine the Shoulder Stud (01-080) for Cracks
Clean the part. Refer to TASK 72-32-21-100-000 (CLEANING-000).
SUBTASK 72-32-21-230-053-002 Examine the Shoulder Stud (01-080) for Cracks
Refer to Figure.
SUBTASK 72-32-21-220-066 Examine the Shoulder Stud (01-080) Threads for High Metal
Refer to Figure.
SUBTASK 72-32-21-220-067 Examine the Shoulder Stud (01-080) Rear Face for High Metal
Refer to Figure
NOTE
The anti-galling compound must be removed from these surfaces before any measurement is taken. Refer to the Cleaning TASK 72-32-21-100-000 (CLEANING-000).Other than Step
Measure the surfaces to be parallel between locations 4 and 5.
Examine the stud for distortion between locations 4 and 5.
SUBTASK 72-32-21-220-069 Examine the Shoulder Stud (01-080) for Distortion
Refer to Figure
Repair, VRS3418 TASK 72-32-21-300-002 (REPAIR-002)
Apply anti-galling compound
Examine the stud for anti-galling compound at locations 1 and 2. The stud must have new anti-galling compound applied after the inspection and repairs are done.
SUBTASK 72-32-21-220-070 Examine the Shoulder Stud (01-080) for Anti-Galling Compound
Figure: Shoulder stud inspection locations
Shoulder stud inspection locations

