Export Control
EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 72-32-42-200-401 No. 1 Bearing Oil Jet And Oil Supply Tube - Related Parts - Examine The No.1 Bearing Oil Jet, Inspection-001
General
This TASK gives the procedure for the inspection of the No.1 bearing oil jet. For the other oil jet and oil supply tube parts, refer to INSPECTION -000 TASK 72-32-42-200-400.
Fig/item numbers in parentheses in the procedure agree with those used in the IPC.
The policy that is necessary for inspection is given in SPM TASK 70-20-01-200-501.
All the parts must be cleaned before any part is examined. Refer to SPM TASK 70-11-14-300-503.
All the parts must be visually examined for damage, corrosion and wear. Any defects that are not identified in the procedure must be referred to IAE.
The procedure for those parts which must have a crack test is given in Stepand Step. Do the test before the part is visually examined. Limits for cracks are given in the SUBTASK for each part.
Do not discard any part until you are sure there are no repairs available. Refer to the instructions in Repair before a discarded part is used again or oversize parts are installed.
Parts which should be discarded can be held although no repair is available. The repair of a discarded part could be shown to be necessary at a later date.
All the parts must be examined to make sure that all the repairs have been completed satisfactorily.
The practices and processes referred to in the procedure by the TASK numbers are in the SPM.
References
Refer to the SPM for data on these items.
Definitions of Damage, SPM TASK 70-02-02-350-501.
Inspection of Parts, SPM TASK 70-20-01-200-501.
Some data on these items are contained in this TASK. For more data on these items refer to the SPM.
Method of Testing for Crack Indications
Chemical Processes
Surface Protection
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Fluorescent penetrant examine for cracks. Refer to Step.
NOTE
For the method to clean the part, refer to SPM TASK 70-11-14-300-503.NOTE
Clean as referred to in Cleaning-000 TASK 72-32-42-100-400.
Do the test for cracks
Reject
Cracked
SUBTASK 72-32-42-230-053 Examine the No.1 Bearing Oil Jet (01-200) for Cracks
Refer to Figure.
Remove obstruction using air blast.
Plugged
Reject
Damage causes which blockage and/or distortion of the oil flow.
Examine the orifice at location 3.
SUBTASK 72-32-42-220-057 Examine the No.1 Bearing Oil Jet (01-200) Orifice
Refer to Figure.
Reject
Cracked
Repair, VRS1275 (Repair-002) TASK 72-32-42-300-002.
Up to 0.010 in. (0.25 mm) in depth
Reject
More than Step.
Galled
Sealing face
Repair, VRS1275 (Repair-002) TASK 72-32-42-300-002.
Edges burred
Bolt holes
Examine the attachment flange at location 4
SUBTASK 72-32-42-220-058 Examine the No.1 Bearing Oil Jet (01-200) Attachment Flange
No.1 bearing oil jet. Refer to SPM TASK 70-23-02-230-501.
Do a crack test on the part that follows:
SUBTASK 72-32-42-230-054 Do a Crack Test on the No.1 Bearing Oil Jet (01-200).
Figure: Locations On The No.1 Bearing Oil Jet
Locations On The No.1 Bearing Oil Jet

