TASK 72-41-34-200-024-B00 HPC Vane Control Rod End Bearings - Examine, Inspection-024

DMC:V2500-A0-72-41-3418-00B-300A-C|Issue No:001.00|Issue Date:2013-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 72-41-34-200-024-B00 HPC Vane Control Rod End Bearings - Examine, Inspection-024

Effectivity

FIG/ITEM PART NO.

01-195

01-412-05E037

01-240

11-412-05E037

01-245

01-412-05E037

01-290

11-412-05E037

01-295

01-412-05E037

01-340

11-412-05E037

01-345

01-412-05E037

General

This TASK gives the procedure for the inspection of the rod end bearing assemblies.

Fig/item numbers in parentheses in the procedure agree with those used in the IPC.

The policy that is necessary for inspection is given in the SPM TASK 70-20-01-200-501.

All the parts must be cleaned before any part is examined.

All the parts must be visually examined for damage, corrosion and wear. Any defects that are not identified in the procedure must be referred to IAE.

Do not discard any part until you are sure there are no repairs available. Refer to the instruction in Repair before a discarded part is used again or oversize parts are installed.

Parts which should be discarded can be held although no repair is available. The repair of a discarded part can be shown to be necessary at a subsequent date.

All the parts must be examined to make sure that all the repairs have been completed satisfactorily.

The practices and processes referred to in the procedure by the TASK number are in the SPM.

References

Refer to the SPM for data on these items:

Definition of Damage, SPM TASK 70-02-02-350-501,

Record and Control of the Lives of Parts, SPM TASK 70-05-00-220-501,

Inspection of Parts, SPM TASK 70-20-01-200-501.

Some data on these items is contained in this TASK. For more data on these items refer to the SPM:

Methods of Testing for Crack Indications,

Chemical Processes,

Surface Protection.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 72-41-34-220-563 Examine the Rod End Bearing Assemblies Bearing

    2. Refer to: Figure.

      1. Bore.

        1. Scored

        2. Reject

        1. Scratched

        2. Reject

        1. Wear.

          1. If the diameter of the rod end bearings (V2500-A5-72-33-34-01A-941A-D (72-33-34, 01-195), V2500-A5-72-33-34-01A-941A-D (72-33-34, 01-240), V2500-A5-72-33-34-01A-941A-D (72-33-34, 01-245), V2500-A5-72-33-34-01A-941A-D (72-33-34, 01-290), V2500-A5-72-33-34-01A-941A-D (72-33-34, 01-295), V2500-A5-72-33-34-01A-941A-D (72-33-34, 01-340), V2500-A5-72-33-34-01A-941A-D (72-33-34, 01-345)) is 0.31250 in (7.9375 mm)

          2. Accept

          1. More than in step (3)(a)

          2. Reject

      1. Galled

      2. Reject

      1. Seized

      2. Reject

      1. Outer surfaces.

        1. Scored

        2. Reject

        1. Scratched

        2. Reject

        1. Visible wear

        2. Reject

      1. Examine the bearing for fore and aft movement.

        1. Fore and aft movement

        2. Reject

      1. Examine the bearing for extruded material.

        1. Any material that has extruded between the inner and the outer bearing surfaces

        2. Reject

    1. SUBTASK 72-41-34-220-564 Examine the Rod End Bearing Assemblies Threads

    2. Refer to: Figure.

      1. Crossed

      2. Reject

      1. Pick-up

      2. Reject

      1. Threads that are not there

      2. Reject

      1. Worn

      2. Reject

    1. SUBTASK 72-41-34-220-566 Examine the Rod End Bearing Assemblies Remaining Surfaces

      1. Burred.

        1. Up to 0.002 in (0.05 mm) in depth

        2. Accept

        1. More than in step A.(1)

        2. Reject

      1. Scored.

        1. Up to 0.002 in (0.05 mm) in depth

        2. Accept

        1. More than in step B.(1)

        2. Reject

      1. Scratched.

        1. Up to 0.002 in (0.05 mm) in depth

        2. Accept

        1. More than in step C.(1)

        2. Reject

  1. Figure: Rod End Bearing Assemblies - Inspection Locations

    Rod End Bearing Assemblies - Inspection Locations

Requirements After Job Completion

Follow-On Conditions

NONE