TASK 72-50-00-200-004 LPT/TEC Flange Brackets - Examine, Inspection-004

DMC:V2500-A0-72-50-0024-00A-310A-C|Issue No:001.00|Issue Date:2013-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 72-50-00-200-004 LPT/TEC Flange Brackets - Examine, Inspection-004

Effectivity

FIG/ITEM PART NO.

01-350

5W8347

01-370

5W8356

01-370

5W8392

01-370

5W8393

General

This TASK gives the procedure for the inspection of the brackets.

Fig/item numbers in parentheses in the procedure agree with those used in the EIPC. Only the primary Fig/item numbers are used. For the service bulletin alpha variants refer to the EIPC.

The policy that is necessary for inspection is given in the SPM TASK 70-20-01-200-501.

All parts must be cleaned before any part is examined. Refer to TASK 72-50-00-100-000.

All parts must be visually examined for damage, corrosion and wear. Any defects that are not identified in the procedure must be referred to the IAE.

The procedure for those parts which must have a crack test is given in Step.

Do the test before the parts are visually examined. Limits for cracks are given in the SUBTASK for each part.

Do not discard any part until you are sure there are no repairs available. Refer to the instructions in Repair before a discarded part is used again or oversize parts are installed.

Parts which should be discarded can be held although no repair is available. The repair of a discarded part could shown to be necessary at a later date.

All parts must be examined to make sure all repairs have been completed satisfactorily.

The practices and processes referred to in the procedure by the TASK/SUBTASK numbers are in the SPM.

References

Refer to the SPM for data on these items.

Definitions of damages, TASK 70-02-02-350-501.

Inspection of parts, TASK 70-20-01-200-501.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 72-50-00-230-059 Examine the Brackets for Cracks

      NOTE

      For the method to clean the parts, refer to the SPM TASK 70-11-14-300-503.
    2. Clean the parts. Refer to the TASK 72-50-00-100-000.

      1. Do the test for cracks on the parts that are given below.

        PART IDENT TASK/SUBTASK

        Bracket

        SPM TASK 70-02-05-220-501TASK 70-23-01-230-501

        1. Cracked

        2. Reject

    1. SUBTASK 72-50-00-220-073 Examine the Brackets Bolt Holes, Refer to

    2. Refer to: Figure

      1. Worn.

        1. The worn hole is less than one point two times of the nominal diameter and the distance between the worn hole and the edge of the bracket is more than 0.066 in. (1.68 mm)

        2. Accept

        1. Other than in (1)

        2. Reject

  1. Figure: Bolt holes

    Bolt holes