EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 72-50-24-300-015 LPT Inner Diffuser Duct Support - Plasma Spray The Front Lip, Repair-015 (VRS4121)
General
Price and availability - none
The practices and processes referred to in the procedure by the TASK number are in the SPM.
NOTE
NOTE
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| CoMat 02-047 TAPE, HEAT REFLECTIVE | 52152 | CoMat 02-047 | ||
| CoMat 02-050 HIGH TEMPERATURE GLASS CLOTH TAPE | 76381 | CoMat 02-050 | ||
| CoMat 03-096 PLASMA SPRAY POWDER | LOCAL | CoMat 03-096 | ||
| CoMat 05-046 ALUMINUM OXIDE GRIT | 62596 | CoMat 05-046 |
Spares
NONESafety Requirements
NONEProcedure
Refer to Figure.
Remove old coating or damage fully.
Keep material removal to the minimum to remove old coating or damage.
Machine the front lip.
SUBTASK 72-50-24-325-068 Machine the Front Lip Outer Diameter
NOTE
Remove the old coating fully, if the front lip was plasma sprayed before.Refer to Figure for dimensions.
Examine dimensionally.
SUBTASK 72-50-24-220-131 Examine the Machined Areas
Refer to the SPM TASK 70-11-34-300-503.
Aqueous degrease.
SUBTASK 72-50-24-110-001 Clean the Support Diffuser, Inner
Mask the areas A3.
Surface texture must be 120 to 200 microinch RMS (3.0 to 5.0 micrometer Ra).
Blasting in area A2 is permitted.
Refer to Figure and the SPM TASK 70-34-03-340-501.
Grit blast the areas A1.
SUBTASK 72-50-24-340-066 Prepare Surfaces for the Plasma Spray Procedure
Overspray area A2 is permitted, refer to Fig. 72-50-24-990-001.
Make sure that there is sufficient material sprayed on to do last machining.
Refer to the SPM TASK 70-34-03-340-501.
Plasma spray the area A1.
SUBTASK 72-50-24-340-067 Plasma Spray the Prepared Surfaces
Refer to the SPM TASK 70-11-34-300-503.
Aqueous degrease.
SUBTASK 72-50-24-110-094 Clean the Support Diffuser, Inner
Refer to Figure and the SPM TASK 70-34-03-340-501.
Grind the coated area.
SUBTASK 72-50-24-325-069 Machine the Coated Areas
Refer to the SPM TASK 70-11-34-300-503.
Aqueous degrease.
SUBTASK 72-50-24-110-003 Clean the Support Diffuser, Inner
Refer to Figure.
Examine machined areas dimensionally.
Refer to the SPM TASK 70-34-03-340-501.
Examine coating visually.
SUBTASK 72-50-24-220-132 Do the Post Repair Inspection
Refer to the SPM TASK 70-09-00-400-501.
Vibropeen VRS4121 and applicable beehive symbol adjacent to the part number.
SUBTASK 72-50-24-350-069 Make a Mark to Identify the Repair
Figure: Plasma spray the front lip
Plasma spray the front lip