EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 72-50-33-200-001-B00 LPT Stage 7 Rotating Airseal - Examine, Inspection-001
General
This TASK gives the procedure for the inspection of the stage 7 turbine air seal. For the other LP Turbine rotating seal parts, refer to TASK 72-50-33-200-000 (INSPECTION-000).
Fig/item numbers in parentheses in the procedure agree with those used in the EIPC.
The policy that is necessary for inspection is given in the SPM TASK 70-20-00-200-501.
All the parts must be cleaned before any part is examined. Refer to the TASK 72-50-33-100-000 (CLEANING-000).
All parts must be visually examined for damage, corrosion and wear. Any defects that are not identified in the procedure must be referred to IAE.
The procedure for those parts which must have a crack test is given in Step. Do the test before the part is visually examined.
Do not discard any part until you are sure there are no repairs available. Refer to the instructions in Repair before a discarded part is used again or oversize parts are installed.
Parts which should be discarded can be held although no repair is available. The repair of a discarded part could be shown to be necessary at a later date.
All parts must be examined to make sure that all the repairs have been completed satisfactorily.
Removal of hardface coating on the knife-edge seals is not necessary: but the hardface removal will supply a more complete and accurate inspection of the knife-edge seals. Refer to VRS4087, TASK 72-50-33-300-040 (REPAIR-040).
The practices and processes referred to in the procedure by the TASK numbers are in the SPM.
References
Refer to the SPM for data on these items.
Definition of Damage SPM TASK 70-02-02-350-501
Record and Control of the Lives of Parts, SPM TASK 70-05-00-220-501
Inspection of Parts, SPM TASK 70-20-00-200-501
Some data on these items is contained in this TASK. For more data on these items refer to the SPM.
Method of Testing for Crack Indications
Chemical Processes
Surface Protection
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| Horizontal rotating table | LOCAL | Horizontal rotating table |
Consumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Refer to: Figure
Clean the parts. Refer to TASK 72-50-33-100-000 (CLEANING-000).
Repair, VRS4449 TASK 72-50-33-300-056 (REPAIR-056)
Maximum depth up to 0.040 in. (1.0 mm)
Repair, VRS4004 TASK 72-50-33-300-036 (REPAIR-036)
More than in (a)
Cracked.
Do the test for cracks on the parts at location A1, that are given below. Use applicable penetrant procedure.
PART IDENT
TASK/SUBTASK
Stage 7 turbine air seal
SUBTASK 72-50-33-230-106 Examine the Stage 7 Turbine Air Seal for Cracks
Refer to: Figure
Repair, VRS4060 TASK 72-50-33-300-039 (REPAIR-039)
More than in (1)
Examine the stage 7 turbine air seal surface at location A3 for nicks. Use horizontal rotating table.
Repair, VRS4060 TASK 72-50-33-300-039 (REPAIR-039)
More than in (1)
Examine the stage 7 turbine air seal surface at location A3 for dents.
Repair, VRS4060 TASK 72-50-33-300-039 (REPAIR-039)
More than in (1)
Examine the stage 7 turbine air seal surface at location A3 for scratches.
SUBTASK 72-50-33-220-125 Examine the Stage 7 Turbine Air Seal for Damage
Refer to: Figure
Repair, VRS4060 TASK 72-50-33-300-039 (REPAIR-039)
More than in (1)
Examine the stage 7 turbine air seal surface at location A2 for nicks. Use horizontal rotating table.
Repair, VRS4060 TASK 72-50-33-300-039 (REPAIR-039)
More than in (1)
Examine the stage 7 turbine air seal surface at location A2 for dents.
Repair, VRS4060 TASK 72-50-33-300-039 (REPAIR-039)
More than in (1)
Examine the stage 7 turbine air seal surface at location A2 for scratches.
Repair, VRS4060 TASK 72-50-33-300-039 (REPAIR-039)
More than in (1)
Examine the seal surface at location A2 for foreign material, deposits, corrosion. scale on all locations.
Repair, VRS4060 TASK 72-50-33-300-039 (REPAIR-039)
More than in (1)
Examine the seal surface for foreign material, deposits, corrosion. scale on all locations A7.
SUBTASK 72-50-33-220-126 Examine the Stage 7 Turbine Air Seal for Surface Damage
Refer to: Figure
Repair, VRS4449 TASK 72-50-33-300-056 (REPAIR-056)
More than in (1)
Examine the stage 7 turbine air seal surface at location A1 for nicks.
Repair, VRS4449 TASK 72-50-33-300-056 (REPAIR-056)
More than in (1)
Examine the stage 7 turbine air seal surface at location A1 for dents.
Repair, VRS4004 TASK 72-50-33-300-036 (REPAIR-036)
More than in (1)
Examine the stage 7 turbine air seal surface at location A1 for bent.
Repair, VRS4087 TASK 72-50-33-300-040 (REPAIR-040)
More than in (1)
Examine the stage 7 turbine air seal surface at location A1 for chipped coating.
SUBTASK 72-50-33-220-127 Examine the Stage 7 Turbine Air Seal for Damage
Refer to: Figure
Repair, VRS4060 TASK 72-50-33-300-039 (REPAIR-039)
More than in (1)
Examine the stage 7 turbine air seal at location A4 (at the tiebolt holes) for nicks, dents and scratches. (including lead - in radii).
SUBTASK 72-50-33-220-128 Examine the Stage 7 Turbine Air Seal for Damage
Refer to: Figure
Repair, VRS4089 TASK 72-50-33-300-041 (REPAIR-041)
More than in (1)
Examine the stage 7 turbine air seal at location A5.
SUBTASK 72-50-33-220-129 Examine the Stage 7 Turbine Air Seal for Fretting
Refer to: Figure
Repair, VRS4004 TASK 72-50-33-300-036 (REPAIR-036) or Repair, VRS4087 TASK 72-50-33-300-040 (REPAIR-040)
Less than in (1)
Measure the diameter D1 for wear at the two seal fins at 120, 240 and 360 degrees. Get an average dimension.
SUBTASK 72-50-33-220-130 Examine the Stage 7 Turbine Air Seal for Wear
Refer to: Figure
Repair, VRS4005 TASK 72-50-33-300-037 (REPAIR-037). Shrunken or grown diameter must not be plasma spray repaired
More than in (1)
Measure the diameter D2 for wear at 120, 240 and 360 degrees. Get an average dimension.
Accept the part for select fit only
NOTE
This part can be used only if the mating part has a diameter that will result in a fit of reference 3364 or 3664 or 3764. Refer to TASK 72-50-30-440-005.
Between 19.1142 and 19.1240 in. (485.50 and 485.75 mm)
Measure the diameter D2 for shrinkage and growth at 120, 240 and 360 degrees. Get an average dimension.
SUBTASK 72-50-33-220-131 Examine the Stage 7 Turbine Air Seal Snap Diameter for Wear
Figure: Examine the Stage 7 Air Seal
Examine the Stage 7 Air Seal