Export Control
EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 73-22-49-200-406 Fuel System Air Tubes - Related Parts - Examine The Fuel System Air Tubes Bracket, Inspection-006
General
This TASK gives the procedure for the inspection of the fuel system air tubes bracket. For the other fuel system air tubes and parts, refer to Inspection-000 TASK 73-22-49-200-400 and the Component Maintenance Manual - Tubes, Ducts and Hoses (CMM-THDV2500- 1IA) Inspection-000 TASK 73-22-49-200-100.
Fig./item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig./item numbers are used. For the Service Bulletin alpha variants refer to the IPC.
The policy that is necessary for Inspection is given in the SPM TASK 70-20-01-200-501.
All the parts must be cleaned before they are examined. Refer to TASK 73-22-49-100-400.
All the parts must be visually examined for damage, corrosion and wear. Any defects that are not identified in the procedure must be referred to IAE.
The procedure for those parts which must have a crack test is given in the relevant SUBTASK. Do the crack test before the part is visually examined.
Do not discard a part until you are sure there are no repairs available. Refer to the instructions in repair before a discarded part is used again or oversize parts are installed.
Parts which must be discarded can be held although no repair is available. The repair of a discarded part could be shown to be necessary at a subsequent date.
All parts must be examined to make sure that all the repairs are completed satisfactorily.
Practices and processes referred to in the procedure by the TASK/SUBTASK number are in the SPM.
NOTE
Reference
Refer to the SPM for data on these items:
Definitions of Damage - Specified Types of Damage, SPM TASK 70-02-02-350-501.
Inspection Policy and Inspection of Parts, SPM TASK 70-20-01-200-501.
Some data on these items is contained in this TASK. For more data on these items refer to the SPM:
Methods of Testing for Crack Indications
Chemical Processes
Surface Protection
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Refer to Cleaning-001 TASK 73-22-49-100-401.
Clean the bracket
Reject
Cracked
For Bracket refer to SPM TASK 70-23-02-230-501.
Bracket
Do a crack test of the part that follow.
SUBTASK 73-22-49-220-172 Examine the Bracket for Cracks
SUBTASK 73-22-49-220-174 Examine the Surface of the Bracket
