EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 73-22-49-200-108 Fuel System Sensing Air Tubes - Examine The EEC Flexible Hoses, Inspection-008
Effectivity
FIG./ITEM | PART NO. |
04-100 | 5A9167 |
04-100 | M1544-1 |
04-100 | 44848 |
07-500 | 5A9166 |
07-500 | M1543-1 |
07-500 | 44456 |
07-500 | 6M1262 |
08-500 | 5A0148 |
08-500 | M1546-1 |
08-500 | 44849 |
11-500 | 107432 |
11-500 | 556-1-15404-000 |
11-500 | C39440 |
11-500 | M1545-1 |
11-500 | 39440 |
12-500 | 107432 |
12-500 | 556-1-15404-000 |
12-500 | C39440 |
12-500 | M1545-1 |
12-500 | 39440 |
General
This TASK gives the procedure for the inspection of the fuel system air tube assembly. For the other fuel system air tubes and parts, refer to Inspection-000 TASK 73-22-49-200-100 and in the Component Maintenance Manual Inspection-000 TASK 73-22-49-200-400.
Fig./item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig./item numbers are used. For the service bulletin alpha variants refer to the IPC.
The policy that is necessary for Inspection is given in the SPM TASK 70-20-01-200-501.
All the parts must be cleaned before they are examined. Refer to Cleaning-000 TASK 73-22-49-100-100.
All the parts must be visually examined for damage, corrosion, and wear. Any defects that are not identified in the procedure must be referred to IAE.
The procedure for those parts which must have a crack test is given in the relevant SUBTASK. Do the crack test before the part is visually examined.
Do not discard a part until you are sure there are no repairs available. Refer to the instructions in Repair before a discarded part is used again or oversize parts are installed.
Parts which must be discarded can be held although no repair is available. The repair of a discarded part could be shown to be necessary at a subsequent date.
All parts must be examined to make sure that all the repairs are completed satisfactorily.
Practices and processes referred to in the procedure by the TASK/SUBTASK number are in the SPM.
NOTE
References
Refer to the SPM for data on these items:
Definitions of Damage - Specified Types of Damage, SPM TASK 70-02-02-350-501.
Inspection Policy and Inspection of Parts, SPM TASK 70-20-01-200-501.
Some data on these items is contained in this TASK. For more data on these items refer to the SPM.
Methods of Testing for Crack Indications
Chemical Processes
Surface Protection
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Reject
Frayed
Reject
Corroded
Reject
Damaged
Wire braiding
Reject
Loose
Reject
Cracked
Ferrules
Reject
Cracked
Reject
Damaged
Lockwire holes
Reject
Pick-up
Reject
Crossed or stripped
Threads
Nuts
Hose connectors
SUBTASK 73-22-49-220-171 Examine the Fuel System Air Tubes Flexible Hoses
Clear with dry compressed air.
Plugged
SUBTASK 73-22-49-220-149 Examine the Fuel System Air Tubes Flexible Hose Bore