EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 75-00-49-200-101 Engine Stage 7 Air Off-Take Air Ducts - Examine, Inspection-001
General
Refer to Inspection-000 TASK 75-00-49-200-400 (CMM-MECH) for other related parts.
Fig/item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig/item numbers are used. For the service bulletin alpha variants refer to the IPC.
All the parts must be visually examined for damage, corrosion and wear. Defects that are not identified in the procedure must be referred to International Aero Engines AG.
Do not discard a part until you are sure there are no repairs available. Refer to the instructions in Repair before a discarded part is used again or oversize parts are installed.
Parts which must be discarded can be held although no repair is available. The repair of a discarded part could be shown to be necessary at a subsequent date.
All parts must be examined to make sure that all the repairs are completed satisfactorily.
The practices and processes referred to in the procedure by the TASK number are in the SPM.
Reference
Refer to the SPM for data on these items:
Definitions of Damage, SPM TASK 70-02-02-350-501.
Inspection of Parts, SPM TASK 70-20-01-200-501.
Some data on these items is contained in this TASK. For more data on these items refer to the SPM.
Procedures for crack tests
Chemical processes
Surface protection
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Clean the parts. Refer to Cleaning-000 TASK 75-00-49-100-100.
SUBTASK 75-00-49-230-051-001 Examine the Engine Air Off-Take Duct for Cracks
Clean the parts. Refer to Cleaning-000 TASK 75-00-49-100-100.
SUBTASK 75-00-49-230-051-002 Examine the Engine Air Off-Take Duct for Cracks
Accept
In areas other than Step , of smooth type and large area related to depth, which does not decrease the duct diameter by more than (ten) percent in one location.
Accept
In areas other than Step, of smooth type and small area, not more than 0.500 sq in. (322.60 sq mm) with a depth not more than 0.075 in. (1.91 mm).
Dented
SUBTASK 75-00-49-220-051 Examine the Surfaces of the Ducts
Repair, VRS6117 (Repair-002) TASK 75-00-49-300-002.
Up to 0.005 in. (0.13 mm) in depth
Reject
Limits more than Step
Galled
Repair, VRS6117 (Repair-002) TASK 75-00-49-300-002.
Up to 0.005 in. (0.13 mm) in depth
Reject
Limits more than Step.
Scored
Repair, VRS6117 (Repair-002) TASK 75-00-49-300-002.
Burred
Bolt holes
SUBTASK 75-00-49-220-053 Examine the Duct Mount Flanges (01-100)
Repair, VRS6118 (Repair-003) TASK 75-00-49-300-003.
Up to 0.005 in. (0.13 mm) in depth
Reject
Limits more than Step.
Galled
Repair, VRS6118 (Repair-003) TASK 75-00-49-300-003.
Up to 0.005 in. (0.13 mm) in depth
Reject
Limits more than Step.
Scored
Repair, VRS6118 (Repair-003) TASK 75-00-49-300-003.
Burred
Bolt holes
Repair, VRS6234 (Repair-009) TASK 75-00-49-300-009.
Damaged
Helicoil inserts
SUBTASK 75-00-49-220-054 Examine the Duct Mount Flanged (01-250)