Export Control
EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 75-24-49-840-004 LPT ACC Connector Air Tube - Replace The Sealing Tube, Rework-004 - SBE 75-0103
General
Price and availability - none.
The practices and processes referred to in the procedure by the TASK number are in the SPM.
NOTE
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| IAE 3M14523 Cut off and welding fixture | 0AM53 | IAE 3M14523 | 1 |
Consumables, Materials and Expendables
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| CoMat 03-288 WELDING FILLER WIRE Ti6Al-4V | LOCAL | CoMat 03-288 | ||
| CoMat 03-195 WELDING WIRE TITANIUM | LOCAL | CoMat 03-195 |
Spares
NONESafety Requirements
NONEProcedure
Use applicable machining equipment and the IAE 3M14523 Cut off and welding fixture.
Cut off the sealing tube.
SUBTASK 75-24-49-320-066 Remove the Sealing Tube
Refer to Figure.
Use applicable inspection equipment.
Visually inspect the machined area.
SUBTASK 75-24-49-220-205 Examine the Machined Area
Refer to SPM TASK 70-11-34-300-503.
Clean the surfaces to be welded.
SUBTASK 75-24-49-110-129 Clean the Areas to be Welded
Refer to SPM TASK 70-31-13-310-501.
Provide an argon as backup.
Flow argon gas into the sealing tube during welding.
Weld in a protective atmosphere.
Weld the new sealing tube (01-341) to the connector tube assembly (01-010).
SUBTASK 75-24-49-310-086 Weld in the Replacement Sealing Tube (01-341)
Refer to SPM TASK 70-23-05-230-501.
Use medium sensitivity level.
No cracks are permitted.
Do the test for cracks.
SUBTASK 75-24-49-230-151 Examine the Welded Areas for Cracks
Refer to Figure.
Use applicable inspection equipment.
Examine the welded areas.
SUBTASK 75-24-49-220-206 Examine the Welded Areas Dimensionally
Refer to SPM TASK 70-11-34-300-503.
Clean the connector tube assembly.
SUBTASK 75-24-49-110-130 Clean the Connector Tube Assembly
Reidentify adjacent to the existing part number as subsequent given.
Refer to SPM TASK 70-09-00-400-501.
Use shallow electrochemical marking method.
NUMBER BEFORE - 3A2316.
NEW NUMBER - 3A3042.
NUMBER BEFORE - 3A2335.
NEW NUMBER - 3A3043.
NUMBER BEFORE - 3A2181.
NEW NUMBER - 3A2988.
Identify the connector tube assembly with the new part number
SUBTASK 75-24-49-850-005 Identify the Connector Tube Assembly with the New Part Number
Figure: Connector Tube Assembly - Replacement of Sealing Tubes
Connector Tube Assembly - Replacement of Sealing Tubes

Connector Tube Assembly - Replacement of Sealing Tubes

Connector Tube Assembly - Replacement of Sealing Tubes

Connector Tube Assembly - Replacement of Sealing Tubes

Connector Tube Assembly - Replacement of Sealing Tubes

