TASK 72-32-80-540-001-A00 LPC Assembly - Unpack The LPC Assembly, Storage-002

DMC:V2500-A1-72-32-8000-00A-840A-B|Issue No:001.00|Issue Date:2013-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

V2500-A1

Common Information

TASK 72-32-80-540-001-A00 LPC Assembly - Unpack The LPC Assembly, Storage-002

General

Fig/item numbers in parentheses in the procedure agree with those used in the IPC. Only the primary Fig/item numbers are used. For the service bulletin alpha variants refer to the IPC.

For all parts identified in a different Chapter/Section/Subject, the applicable Chapter/Section/Subject comes before the Fig/item number.

For standard torque data and procedures refer to the SPM TASK 70-41-00-400-501, SPM TASK 70-41-01-400-501 and SPM TASK 70-41-02-410-501.

Lubricate all threads and abutment faces of nuts and bolts with CoMat 10-077 APPROVED ENGINE OILS unless other lubricants are referred to in the procedure.

Refer to the V2500 Illustrated Tool and Equipment Manual (ITEM) Pub ref ITE-V2500-1IA, for the illustrations of the special tools given in this procedure.

Make sure that all flange faces and tool faces that touch are very clean.

NOTE

To identify the consumable materials refer to the PCI.

NOTE

Special tools are identified in the procedure by the tool primary number.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NameManufacturerPart Number / IdentificationQuantityRemark
Four legged slingLOCALFour legged sling
IAE 1J13103 Vertical sling0AM53IAE 1J131031
IAE 1J13111 LPC storage stand0AM53IAE 1J131111
IAE 5J13192 Shipping container0AM53IAE 5J13192
IAE 1J13107 Holding support0AM53IAE 1J13107

Consumables, Materials and Expendables

NameManufacturerPart Number / IdentificationQuantityRemark
CoMat 10-077 APPROVED ENGINE OILSLOCALCoMat 10-077

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 72-32-80-540-051 Remove the Cover Assembly of the Shipping Container

    2. Refer to Figure.

    3. Check the humidity indicator.

    4. Use the relief valve to make the container internal pressure the same as the external pressure.

    5. Attach a suitable four legged sling to a hoist.

    6. Move the hoist over the IAE 5J13192 Shipping container 1 off and attach the four legged sling to the four cover assembly lift rings.

    7. Release all the butterfly catches.

    8. Lift the cover assembly of the shipping container away from the shipping container base and put it on a suitable surface.

    9. Remove the sling from the hoist.

    10. Empty the desiccant receptacle.

    1. SUBTASK 72-32-80-540-052 Examine the LPC Assembly

    2. Check the relevant documentation with the LPC assembly details.

    3. Visually inspect the LPC assembly for corrosion and damage.

    1. SUBTASK 72-32-80-540-053 Remove the LPC Assembly from the Carriage Base

    2. Refer to Figure.

    3. Make sure that the LPC assembly together with IAE 1J13107 Holding support 1 off. If is not, refer to TASK 72-32-80-440-001-A00 (ASSEMBLY, CONFIG-001).

      1. Prepare the carriage base.

      2. Release the handling bolt on the carriage base. Move the locator top into the open postion.

      3. Make sure that all the faces are clean on the flange and tool faces that touch.

      1. Attach the IAE 1J13103 Vertical sling 1 off to the LPC assembly.

      2. Install the three eye bolts (part of the vertical sling) into three of the six threaded holes in the flange. The three threaded holes must be equally spaced apart.

      3. Attach the hoist to the vertical sling. Lift the vertical sling and put it over the LPC assembly.

      4. Adjust the height of the vertical sling to permit the hooks to be installed.

      5. Attach the three hooks to the eye bolts.

    4. Lift the LPC assembly clear of the carriage base.

    5. Put the IAE 1J13111 LPC storage stand 1 off under the LPC assembly.

    6. Put the LPC assembly on the IAE 1J13111 LPC storage stand.

    7. Remove the vertical sling from the LPC assembly and put it on an applicable work surace.

    8. Remove the sling from the hoist.

    9. Remove the eye bolts from the LPC assembly.

    1. SUBTASK 72-32-80-540-054 Install the Shipping Container Cover 72-32-80-990-063

    2. Attach the hoist to the four legged sling that is attached to the cover assembly of the shipping container.

    3. Lift the cover assembly of the shipping container put it over the carriage base.

    4. Lower the cover assembly of the shipping container on to the carriage base.

    5. Attach the cover assembly of the shipping container to the carriage base with all the butterfly catches.

    6. Remove the four legged sling from the lift rings of the cover assembly.

    7. Remove the four legged sling from the hoist and put it on an applicable work surface.

  1. Figure: LP compressor booster stage assembly shipping equipment

    LP compressor booster stage assembly shipping equipment

Requirements After Job Completion

Follow-On Conditions

NONE
Manufacturer Code:0AM53
Enterprise Name:IAE INTERNATIONAL AERO ENGINES AG
BU Name:NULL
Building:SUITE 400
Street:628 HEBRON AVENUE
City:GLASTONBURY
State:CT
Zip Code:06033
Country:USA
Manufacturer Code:LOCAL
Enterprise Name:LOCALLY SUPPLIED
Manufacturer Code:X333X
Supply Number:CoMat 10-077
Type:sp01
Supply Short Name:CoMat 10-077 APPROVED ENGINE OILS
Supply Name:CoMat 10-077 APPROVED ENGINE OILS
Specification Groups:
Doc NumberType
For V2500-A1/A5/D5 models - Refer to V2500 Service Bulletin ENG-79-0108
For V2500-E5 model - Refer to Service Bulletin E5-79-0001
Suppliers:
ManufacturerRemarks
X333X
Manufacturer Code:LOCAL
Tool Number:Four legged sling
Tool Name:Four legged sling
Manufacturer Code:0AM53
Tool Number:IAE 1J13103
Tool Name:IAE 1J13103 Vertical sling
Manufacturer Code:0AM53
Tool Number:IAE 1J13107
Tool Name:IAE 1J13107 Holding support
Manufacturer Code:0AM53
Tool Number:IAE 1J13111
Tool Name:IAE 1J13111 LPC storage stand
Manufacturer Code:0AM53
Tool Number:IAE 5J13192
Tool Name:IAE 5J13192 Shipping container