EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
V2500-A1
Common Information
TASK 72-50-32-200-006-A00 LPT Stage 3 Blade - Examine For Overtemperature, Inspection-006
General
This TASK gives the procedure for the inspection of the stage 3 turbine blades.
Fig/item numbers in parentheses in the procedure agree with those used in the EIPC.
The policy that is necessary for inspection is given in the SPM TASK 70-20-00-200-501
All the parts must be cleaned before any part is examined. Refer to TASK 72-50-32-100-000, (CLEANING-000)
All parts must be visually examined for damage, corrosion and wear. Any defects that are not identified in the procedure must be referred to IAE.
The practices and processes referred to in the procedure by the TASK numbers are in the SPM.
References
Refer to the SPM for data on these items.
Definition of Damage, SPM TASK 70-02-02-350-501
Inspection of parts, SPM TASK 70-20-00-200-501
Some data on these items are contained in this TASK. For more data on these items refer to the SPM.
Chemical Processes
Surface Protection
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Do this inspection if the stage 2 HP turbine blades are rejected for an overtemperature condition.
Before examination of the blade do the hardness test of the stage 3 turbine disk. Refer to TASK 72-50-31-200-005, (INSPECTION/CHECK-005).
Blades that were at temperatures more than the limit of 2000 deg F (1093 deg C) for a short time will cause a change in the alloy microstructure of the blade.
Overtemperature condition, also for short time, changes the structure of the gamma particles, together with a decrease of size and volume percentage. Signs of overtemperature are decrease in volume percentage of the gamma phase and compare the microstructure against a referenced standard.
If the stage 3 turbine disk shows hardness loss, reject complete set of stage 3 turbine blades and vanes and examine the stage 4 turbine blades per TASK 72-50-32-200-007-A00, (INSPECTION/CHECK-007, CONFIG-001), TASK 72-50-32-200-007-B00, (INSPECTION/CHECK-007, CONFIG-002) and TASK 72-50-32-200-007-C00, (INSPECTION/CHECK-007, CONFIG-003)) for overtemperature.
Examine one blade for overtemperature by metallurgical analysis. Use the blade with the strongest discoloration.
SUBTASK 72-50-32-220-170 Examine the Stage 3 Turbine Blades for Overtemperature
NOTE
NOTE
Do this inspection only if the hardness test of the stage 3 LP turbine disk shows no decrease of hardness. Refer to TASK 72-50-31-200-005, (INSPECTION/CHECK-005).If blade metal temperature exceeded the specified limit of 2000 deg F (1093 deg C), but not more than 2050 deg F (1121 deg C), 3rd stage vanes with the following part numbers must be inspected for cracks as follows:
PN: 3A0645CL45, 3A0641CL45, 3A1729CL45, 3A1733CL45
refer to TASK 72-50-22-200-005-A00
PN: 3A2073CL33, 3A2077CL33
refer to TASK 72-50-22-200-005-B00
PN: 3A2243CL33, 3A2245CL33
refer to TASK 72-50-22-200-005-B00
PN: 3A2412, 3A2415, 3A2926, 3A2929
refer to TASK 72-50-22-200-007-A00
3rd stage vanes with unacceptable cracks have to be rejected.
SUBTASK 72-50-32-220-497 Reject the Stage 3 Turbine Vanes
If the stage 3 turbine blades were rejected because of overtemperature, examine the stage 4 turbine blades per TASK 72-50-32-200-007-A00, (INSPECTION/CHECK-007, CONFIG-001), TASK 72-50-32-200-007-B00, (INSPECTION/CHECK-007, CONFIG-002) and TASK 72-50-32-200-007-C00, (INSPECTION/CHECK-007, CONFIG-003) for overtemperature.
SUBTASK 72-50-32-220-498 Examine the Stage 4 Turbine Blades for Overtemperature