EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 72-00-50-220-002 LPT Module - Examine The LPT Case And Rotor At Interface N-50/10, Inspection-002
General
The word 'reject' after an interface inspection statement requires that further detailed inspection or repair as applicable, of the affected area be accomplished using data in the applicable ATA section of the part in question. Contact IAE for FAA approved data if the referenced TASK is not in the manual.
Refer to TASK 72-00-00-200-000, before you do this TASK.
The policy that is necessary for inspection is given in the SPM TASK 70-20-01-200-501.
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| Illuminated magnifier (portable) | LOCAL | Illuminated magnifier (portable) |
Consumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Before inspection, clean the interface parts. Refer to TASK 72-00-50-100-001 (CLEANING-001).
For the inspections use the Illuminated magnifier (portable).
SUBTASK 72-00-50-220-141 General Instructions for the Inspection of the LP Turbine at Interface
Refer to Figure.
SUBTASK 72-00-50-220-062 Visually Examine the OD (Outer Diameter) Surface of the LP Turbine Shaft Diameter at Location 3
Refer to Figure.
SUBTASK 72-00-50-220-064 Visually Examine the Tangs of the LP Turbine Shaft at Location 5
Refer to Figure.
SUBTASK 72-00-50-220-065 Visually Examine the Internal Retaining Rings at Locations 6 and 7
Refer to Figure.
SUBTASK 72-00-50-220-066 Visually Examine the Locking Ring at Location 8
Refer to Figure.
SUBTASK 72-00-50-220-165 Visually Examine the Stage 6 Turbine Inner Air Seal at Location 11
NOTE
Do the examination to the extent possible.
Figure: Locations at interface N-50/10
Locations at interface N-50/10

Figure: Locations at interface N-50/10