Export Control
EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 72-45-23-200-001-B00 HPT Stage 1 Duct Band Segment - Examine, Inspection-001
General
This TASK gives the procedure for the inspection of the stage 1 HPT band segment assembly. For the other parts of the stage 1 HPT duct segment assembly, refer to TASK 72-45-23-200-000.
Fig/item numbers in parentheses in the procedure agree with those used in the IPC.
The policy that is necessary for inspection is given in SPM TASK 70-20-00-200-501.
All the parts must be cleaned before any part is examined. Refer to SPM TASK 70-10-00-100-501.
All parts must be visually examined for damage, corrosion and wear. Any defects that are not identified in the procedure must be referred to IAE.
Do not discard any part until you are sure there are no repairs available. Refer to the instructions in Repair before a discarded part is used again or oversize parts are installed.
Parts which should be discarded can be held although no repair is available. The repair of a discarded part could be shown to be necessary at a later date.
All parts must be examined to make sure that all the repairs have been completed satisfactorily.
The practices and processes referred to in the procedure by the TASK numbers are in SPM.
References
Refer to SPM for data on these items.
Definitions of Damage, SPM TASK 70-02-02-350-501.
Inspection of Parts, SPM TASK 70-20-01-200-501.
Some data on these items is contained in this TASK. For more data on these items refer to SPM.
Method of Testing for Crack Indications.
Chemical Processes.
Surface Protection.
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Clean the part. Refer to TASK 72-45-23-100-000.
Repair, VRS3725 TASK 72-45-23-300-020 (REPAIR-020).
Cracks not more than 0.400 in. (10.160 mm) from part edges.
Cracks other than Step.
Do the test for cracks on the part that is given below. Use the applicable penetrant inspection procedure.
PART IDENT
TASK/OP
Stage 1 HPT band segment assembly
Refer to SPM TASK 70-23-01-230-501
(Dip or Spray)
SUBTASK 72-45-23-230-055-001 Examine the Stage 1 HPT Band Segment Assembly (01-020 and 01-040) for Cracks
Clean the part. Refer to TASK 72-45-23-100-000.
Repair, VRS3725 TASK 72-45-23-300-020 (REPAIR-020).
Cracks not more than 0.400 in. (10.160 mm) from part edges.
Cracks other than Step.
Do the test for cracks on the part that is given below. Use the applicable penetrant inspection procedure.
PART IDENT
TASK/OP
Stage 1 HPT band segment assembly
Refer to SPM TASK 70-23-02-230-501
(Dip or Spray)
SUBTASK 72-45-23-230-055-002 Examine the Stage 1 HPT Band Segment Assembly (01-020 and 01-040) for Cracks
Refer to Figure.
Repair, VRS3725 TASK 72-45-23-300-020 (REPAIR-020).
Other than Step.
Wear.
Examine the band segment front and rear edges at location 1, for wear.
SUBTASK 72-45-23-220-067 Examine the Stage 1 HPT Band Segment Assembly (01-020 and 01-040) Front and Rear Edges for Wear
Figure: Stage 1 HPT Band Segment Assembly Inspection Locations
Stage 1 HPT Band Segment Assembly Inspection Locations