TASK 72-60-23-200-003 Hydraulic Pump Drive Gear Rotating Seal Ring - Examine, Inspection-003

DMC:V2500-A0-72-60-2303-00A-300A-C|Issue No:002.00|Issue Date:2018-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 72-60-23-200-003 Hydraulic Pump Drive Gear Rotating Seal Ring - Examine, Inspection-003

Effectivity

FIG/ITEM

PART NO.

01-360

7T0473

01-360

7T0453

General

This TASK gives the procedure for the inspection of the rotating ring of the hydraulic pump. For the other parts of the hydraulic pump drive gear assembly, refer to TASK 72-60-23-200-000.

Fig/item numbers in parentheses in the procedure to agree with those used in the IPC.

The policy that is necessary for inspection is given in the SPM TASK 70-20-01-200-501.

All the parts must be cleaned before any part is examined. Refer to SPM TASK 70-11-03-300-503.

All parts must be visually examined for damage, corrosion and wear. Any defects that are not identified in the procedure must be referred to IAE.

The procedure for those parts which must have a crack test is given in the SPM TASK 70-23-00-230-501. Do the test before the part is visually examined. Limits for crack are given in SUBTASK for each part.

A ** following repair referenced in this inspection indicates that the repair is not yet published in the current revision of the manual and the part must be rejected. Contact IAE for additional information concerning FAA approved repair date.

Do not discard any parts until you are sure there are no repairs available. Refer to the instructions in Repair before a discarded part is used again or oversize parts are installed.

Parts which should be discarded can be held although no repair is available. The repair of a discarded part could be shown to be necessary at a later date.

All parts must be examined to make sure that all the repairs have been completed satisfactorily.

The practices and processes referred to in the procedure by the TASK numbers are in the SPM.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 72-60-23-240-057 Examine the Rotating Ring (01-360) for Cracks

      1. Do the test for cracks on the parts that are given below.

        PART IDENT

        PROCEDURE

        CURRENT/INSPECT

        TASK/SUBTASK

        Rotating ring

        TB

        500 Amp

        SPM TASK 70-24-01-240-501, SUBTASK 70-24-01-240-011

        CF

        Two shots, 90 degrees apart

        300 Amp

        SPM TASK 70-24-01-240-501, SUBTASK 70-24-01-240-010

        1. Cracked.

        2. Reject.

    1. SUBTASK 72-60-23-220-095 Examine the Rotating Ring (01-360) Piloting Diameter at Location 1

    2. Refer to Figure.

      1. Diameter.

        1. Between 1.6547 in. and 1.6555 in. (42.03 mm and 42.05 mm).

        2. Accept.

        1. More than 1.6555 in. (42.05 mm).

        2. Repair, VRS5001 TASK 72-60-22-300-001 (Repair-001).

      1. Perpendicularity.

        1. In 0.0005 in. (0.0127 mm) FIR in relation to Surface A.

        2. Accept.

        1. More than Step.

        2. Repair, VRS5001 TASK 72-60-22-300-001 (Repair-001).

    1. SUBTASK 72-60-23-220-096 Examine the Rotating Ring (01-360) Seal Surface at Location 2

    2. Refer to Figure.

      1. Flat surface.

        1. In 3 helium lights bands or less.

        2. Accept.

        1. More than Step.

        2. Repair, VRS5002 TASK 72-60-22-300-002 (Repair-002).

      1. Corrosion, pits and scratches.

        1. The maximum depth of damage is 0.005 in. (0.127 mm) the maximum length of damage is 0.01 in. (0.254 mm).

        2. Accept.

        1. More than Step.

        2. Repair, VRS5002 TASK 72-60-22-300-002 (Repair-002).

  1. Figure: Locations - Rotating ring of the Hydraulic Pump

    Locations - Rotating ring of the Hydraulic Pump

Requirements After Job Completion

Follow-On Conditions

NONE
Change Type:

Added inspection for cracks. (18VC267)