Export Control
EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 75-24-47-200-407 HPT/LPT Active Clearance Control (ACC) Ducts - Related Parts - Examine The ACC Front Duct Cover Assembly, Inspection-007
General
This TASK gives the procedure for inspection of the ACC front duct cover assembly. For the other parts of the HP/LP ACC ducts, refer to Inspection-000 TASK 75-24-47-200-400.
Fig/item numbers in parentheses in the procedure agree with those used in the IPC.
The policy that is necessary for cracks is given in SPM TASK 70-20-01-200-501.
All the parts must be visually examined for damage, corrosion and wear. Any defect that are not identified in the procedure must be referred to IAE.
Do not discard any part until you are sure there are no repairs available. Refer to the instruction in Repair before a discarded part is used again or oversized parts are installed.
Parts which should be discarded can be held although no repair is available. The repair of a discarded part could be shown to be necessary at a later date.
All the parts must be examined to make sure that all the repairs have been completed satisfactorily.
The procedure for the crack test is given in Step. Do the test before the part is visually examined.
The practices and processes referred to in the procedure by the TASK/SUBTASK number are in the SPM.
References
Refer to the SPM for data on these items:
Definitions of Damage, SPM TASK 70-02-02-350-501.
Inspection of Parts, SPM TASK 70-20-00-200-501.
Some data on these items is contained in this TASK. For more data on these items refer to the SPM:
Method of Testing for Crack Indications.
Chemical Processes
Surface Protection
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| Fluorescent Penetrant Inspection Equipment | LOCAL | Fluorescent Penetrant Inspection Equipment |
Consumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Clean the part. Refer to Cleaning-000 TASK 75-24-47-100-400.
Repair, VRS1504 (Repair-015) TASK 75-24-47-300-015.
Cracked plate (Fig/item 01-089, Part No.2A3638)
Repair, VRS1504 (Repair-015) TASK 75-24-47-300-015.
Cracked clip (Fig/item 01-081, Part No.2A3639)
ACC front duct cover assembly. Refer to SPM TASK 70-23-02-230-501.
Do the crack test on the part that is given below. Use the applicable penetrant inspection procedure.
SUBTASK 75-24-47-230-056 Examine the ACC Front Duct Cover Assembly for Cracks
Repair, VRS1503 (Repair-014) TASK 75-24-47-300-014.
Not more than 0.012 in. (0.30 mm) in depth
Reject
More than in Step.
Nicked
Repair, VRS1503 (Repair-014) TASK 75-24-47-300-014.
Not more than 0.012 in. (0.30 mm) in depth
Reject
More than in Step.
Dented
Repair, VRS1503 (Repair-014) TASK 75-24-47-300-014.
Not more than 0.012 in. (0.30 mm) in depth
Reject
More than in Step.
Scratched
Examine all the surface
SUBTASK 75-24-47-220-072 Examine the ACC Front Duct Cover Assembly Surface
Repair, VRS1504 (Repair-015) TASK 75-24-47-300-015.
Damage
Repair, VRS1504 (Repair-015) TASK 75-24-47-300-015.
Loosened rivet
Examine the plate nut
SUBTASK 75-24-47-220-073 Examine the ACC Front Duct Cover Assembly Plate Nut of Clip