TASK 79-21-49-200-406 Pressure Oil Tubes - Related Parts - Examine The Engine Pressure Oil Tube Bracket Remaining Parts, Inspection-006

DMC:V2500-A0-79-21-4900-05A-310A-C|Issue No:001.00|Issue Date:2013-11-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 79-21-49-200-406 Pressure Oil Tubes - Related Parts - Examine The Engine Pressure Oil Tube Bracket Remaining Parts, Inspection-006

Effectivity

FIG/ITEM

PART NO.

VARIOUS

BOLT

VARIOUS

NUT

General

For the other engine pressure oil tube parts refer to Inspection-000 V2500-A0-79-21-4900-00A-307A-C and Cleaning-000 TASK 79-21-49-100-100 in the Component Maintenance Manual (CMMTHD-V2500-1IA).

All the parts must be cleaned before they are examined. Refer to Cleaning-000 TASK 79-21-49-100-400.

All the parts must be visually examined for damage, corrosion and wear. Defects that are not identified in the procedure must be referred to IAE.

The practices and processes referred to in the procedure by the TASK/SUBTASK numbers are in the SPM.

References

Refer to the SPM for data on these items.

Definitions of Damage, SPM TASK 70-02-02-350-501.

Inspection of Parts, SPM TASK 70-20-01-200-501.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NONE

Consumables, Materials and Expendables

NONE

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 79-21-49-220-098 Examine the Bolts

      1. Threads

        1. Crossed

        2. Reject

        1. Stripped

        2. Reject

        1. Missing

        2. Reject

        1. Worn

        2. Refer to SPM TASK 70-42-01-400-501.

      1. Surfaces

        1. Nicked

          1. Nicked to a depth of 0.002 in. (0.05 mm) with no high metal.

          2. Accept

          1. More than in Step.

          2. Reject

      1. Head

        1. Burred

          1. Burred but with no decrease in function.

          2. Accept

          1. In excess of Step.

          2. Reject

    1. SUBTASK 79-21-49-220-099 Examine the Self-Locking Nuts

      1. Threads

        1. Crossed

        2. Reject

        1. Stripped

        2. Reject

        1. Missing

        2. Reject

        1. Worn

        2. Refer to SPM TASK 70-42-01-400-501.

      1. Surfaces

        1. Burred/nicked

          1. Burred/nicked but with no decrease in function.

          2. Accept

          1. In excess of Step.

          2. Reject

Requirements After Job Completion

Follow-On Conditions

NONE