Export Control
EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 72-32-71-200-006-B00 LPC Bleed Valve Support Ring - Examine, Inspection-006
General
This TASK gives the procedure for the inspection of the support ring assembly. For the other bleed valve support and arm parts, refer to TASK 72-32-71-200-000 (INSPECTION-000).
The policy that is necessary for inspection is given in SPM TASK 70-20-01-200-501.
All the parts must be cleaned before any part is examined. Refer to TASK 72-32-71-100-000 (CLEANING-000).
All parts must be visually examined for damage, corrosion and wear. Any defects that are not identified in the procedure must be referred to IAE.
The procedure for those parts which must have a crack test is given in Step. Do the test before the part is visually examined.
Do not discard any part until you are sure there are no repairs available. Refer to the instructions in the repair before a discarded part is used again or oversize parts are installed.
Parts which should be discarded can be held although no repair is available. The repair of a discarded part could be shown to be necessary at a later date.
All parts must be examined to make sure that all the repairs have been completed satisfactorily.
The practices and processes referred to in the procedure by the TASK/SUBTASK numbers are in SPM.
References
Refer to SPM for data on these items.
Definitions of damage, SPM TASK 70-02-02-350-501
Inspection of parts, SPM TASK 70-20-01-200-501
Some data on these items is contained in this TASK. For more data on these items refer to SPM.
Method of testing for crack indications
Chemical processes
Surface protection
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Clean the part. Refer to TASK 72-32-71-100-000 (CLEANING-000).
SUBTASK 72-32-71-230-072 Examine the Support Ring Assembly (01-600) for Cracks
Refer to Figure.
Repair, VRS1746 TASK 72-32-71-300-017 (REPAIR-017).
Nicked or scratched
Flange face at location 7.
More than in Step
Galled.
Repair, VRS1746 TASK 72-32-71-300-017 (REPAIR-017).
Edges burred
Slots at location 5.
SUBTASK 72-32-71-220-118 Examine the Support Ring Assembly (02-600) Flange
Refer to Figure.
SUBTASK 72-32-71-220-119 Examine the Support Ring Assembly (02-600) Pin Hole
Refer to Figure.
SUBTASK 72-32-71-220-120 Examine the Support Ring Assembly (02-600) Sleeve Hole
Refer to Figure.
Repair, VRS1747 TASK 72-32-71-300-018 (REPAIR-018)
Chipped or missing
Pin at location 2.
SUBTASK 72-32-71-220-121 Examine the Support Ring Assembly (02-600) Pin
Refer to Figure.
Repair, VRS1746 TASK 72-32-71-300-017 (REPAIR-017).
Nicked, scratched or chafed.
Inner surface at location 9.
SUBTASK 72-32-71-220-154 Examine the Support Ring Assembly (02-600) Inner Surface
Refer to Figure.
Repair, VRS1746 TASK 72-32-71-300-017 (REPAIR-017)
Nicked or scratched
All the surfaces which do not include the identified locations.
SUBTASK 72-32-71-220-123 Examine the Support Ring Assembly (02-600) Surface
Figure: Locations on the Support Ring Assembly
Locations on the Support Ring Assembly

