EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
V2500-A5
Common Information
TASK 72-00-31-200-002-C00 LPC Fan Blade Annulus Filler - Examine (Level 2 Inspection Limits), Inspection-002
Effectivity
FIG/ITEM | PART NO. |
LP Compressor Blades and Fillers(72-31-11,01-100) | 5A1459 |
LP Compressor Blades and Fillers(72-31-11,01-100) | 5A1611 |
LP Compressor Blades and Fillers(72-31-11,01-100) | 5A1710 |
LP Compressor Blades and Fillers(72-31-11,01-100) | 5A1750 |
LP Compressor Blades and Fillers(72-31-11,01-100) | 5A1752 |
LP Compressor Blades and Fillers(72-31-11,01-100) | 5A1753 |
General
This TASK gives the procedure for the inspection of the annulus filler below major soft time and scheduled for a level 2 inspection, as given in the Maintenance Management Program.
All the parts must be cleaned before any part is examined. Refer to SPM TASK 70-11-03-300-503.
These inspections are to be done in conjunction with those given in the interface inspections (Refer to TASK 72-00-00-200-000).
The module will be sufficiently disassembledTASK 72-31-00-030-001 for the components to be examined as specified in accordance with this procedure.
The word "Reject" is used after an interface/SP50 inspection statement to show that a higher-level inspection and possible repair to the damaged part is necessary if the part is rejected, refer to the related inspection/check. Do the higher level inspection procedure as found in the applicable Chapter/Section/Subject of this manual on the damaged part(s).
The policy necessary for the inspection is given in SPM TASK 70-20-00-200-501.
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Refer to Figure.
More than in Step
Nicked, dented, scratched or corrosion pitted.
More than in Step
Missing anti-erosion coating.

CAUTION
YOU MUST DO THE FOLLOWING INSPECTIONS IN CONJUNCTION WITH THE INTERFACE INSPECTIONS DEFINED ON TASK 72-00-31-220-002.Examine the platform at location 2.
SUBTASK 72-00-31-220-213 Examine the Annulus Filler for the Platform
Refer to Figure.
Repair, VRS1018 TASK 72-31-11-300-022.
Seals that are loose or are not there
Repair, VRS1018 TASK 72-31-11-300-022
More than in (a)
Examine the seals for wear.
Examine the seals at location 1.
SUBTASK 72-00-31-220-214 Examine the Rubber Seals
Refer to Figure.
SUBTASK 72-00-31-220-215 Examine the Annulus Fillers for Front Trunions and Aft Trunnions
Figure: Location of Dry Film Lubricant on the Annulus Filler
Sheet 1

Figure: Location of Dry Film Lubricant on the Annulus Filler
Sheet 2