Export Control
EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
Post SBE 72-0564 (SELECTONE PRODUCTION STANDARD)
Common Information
TASK 72-41-30-440-010-C00 HPC Front Case And Vane Assembly - Disassemble (For Final Assembly) The HPC Front Cases, Assembly-010 - SBE 72-0564 (SelectOne Production Standard)
General
This TASK gives the procedure to disassemble the HP compressor front cases. The subsequent TASKS give the procedure to assemble the HP compressor front case only for the engines, which have SBE 72-0564 (SelectOne Production Standard) incorporated.
Fig/item numbers in parentheses in the procedure agree with those used in the EIPC. Only the primary Fig/item numbers are used. For the service bulletin alpha variants refer to the EIPC.
For all parts identified in a different Chapter/Section/Subject, the applicable Chapter/Section/Subject comes before the Fig/item number.
All of the temporary marks made in this procedure must be removed after completion of this task.
Refer to Figure for a sectional view of the HP compressor front case.
TASK 72-41-30-440-001-C00 (ASSEMBLY-001, CONFIG-003) Install the HP Compressor Stage 4 and 5 Rotor Path Rings and Stage 6 Rotor Ring Segments.
TASK 72-41-30-440-002-B00 (ASSEMBLY-002, CONFIG-002) Measure and then Machine the Stage 6 Stator Vanes and the Stage 4, 5 and 6 Rotor Path Rings.
TASK 72-41-30-440-003-C00 (72-41-30. ASSEMBLY-03, CONFIG-03) Install the VIGV.
TASK 72-41-30-440-004-C00 (72-41-30. ASSEMBLY-04, CONFIG-03) Install the Stage 3 VSV.
TASK 72-41-30-440-005-C00 (ASSEMBLY-005, CONFIG-003) Install the Stage 4 VSV.
TASK 72-41-30-440-006-C00 (ASSEMBLY-006, CONFIG-003) Install the Stage 5 VSV.
TASK 72-41-30-440-007-B00 (ASSEMBLY-007, CONFIG-002) Install the Stage 6 Stator Vanes.
TASK 72-41-30-440-008-C00 (ASSEMBLY-008, CONFIG-003) Install the VIGV and the Stage 3 to 5 Bridge Pieces.
TASK 72-41-30-440-009-C00 (ASSEMBLY-009, CONFIG-003) Measure the HP Compressor Front Cases.
TASK 72-41-30-440-011-C00 (ASSEMBLY-011, CONFIG-003) Check and Set VSV System with Optimised Build and Setting Clearances.
NOTE
NOTE
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| IAE 1R18204 Location ring | 0AM53 | IAE 1R18204 | 2 | |
| IAE 1R18205 Lifting tool | 0AM53 | IAE 1R18205 | 1 | |
| IAE 1R18207 Support stand | 0AM53 | IAE 1R18207 | 1 | |
| IAE 1R19284 Lifting fixture | 0AM53 | IAE 1R19284 | ||
| IAE 1R18833 Half case container | 0AM53 | IAE 1R18833 | 1 |
Consumables, Materials and Expendables
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| CoMat 02-121 TEMPORARY MARKER PENCIL/CRAYON | IE304 | CoMat 02-121 | ||
| CoMat 02-122 TEMPORARY MARKER PENCIL/CRAYON | K6835 | CoMat 02-122 |
Spares
NONESafety Requirements
NONEProcedure
Install IAE 1R18205 Lifting tool 1 off on to the rear flange of the HP compressor front cases. Refer to TASK 72-41-30-440-002.
Install the HP compressor front case on to IAE 1R18204 Location ring 1 off on IAE 1R18207 Support stand 1 off. Refer to TASK 72-41-30-440-001.
SUBTASK 72-41-30-440-246 Remove the HP Compressor Front Case from the Checking Fixture
Refer to Figure.
Use CoMat 02-121 TEMPORARY MARKER PENCIL/CRAYON or CoMat 02-122 TEMPORARY MARKER PENCIL/CRAYON to identify each part with its position on the assembly.
Identify each part with its position on the assembly before it is removed.
SUBTASK 72-41-30-440-247 Remove the Stage 5 VSV Bridging Piece Assemblies
Refer to Figure.
Use CoMat 02-121 TEMPORARY MARKER PENCIL/CRAYON or CoMat 02-122 TEMPORARY MARKER PENCIL/CRAYON to identify each part with its position on the assembly.
Identify each part with its position on the assembly before it is removed.
SUBTASK 72-41-30-440-248 Remove the Stage 4 VSV Bridging Piece Assemblies
Refer to Figure.
Use CoMat 02-121 TEMPORARY MARKER PENCIL/CRAYON or CoMat 02-122 TEMPORARY MARKER PENCIL/CRAYON to identify each part with its position on the assembly.
Identify each part with its position on the assembly before it is removed.
SUBTASK 72-41-30-440-249 Remove the Stage 3 VSV Bridging Piece Assemblies
Refer to Figure.
Use CoMat 02-121 TEMPORARY MARKER PENCIL/CRAYON or CoMat 02-122 TEMPORARY MARKER PENCIL/CRAYON to identify each part with its position on the assembly.
Identify each part with its position on the assembly before it is removed.
SUBTASK 72-41-30-440-250 Remove the Inlet Guide Vane Bridging Piece Assemblies
Refer to Figure.
SUBTASK 72-41-30-440-251 Remove the HP Compressor Front Case Split Line Nuts, Spacers and Bolts

CAUTION
YOU MUST NOT LET THE BOLTS TURN WHEN YOU REMOVE THEM. THE BOLTS ARE A CLOSE TOLERANCE FIT.Install the IAE 1R19284 Lifting fixture 2 off on to the HP compressor front cases rear flange. Refer to TASK 72-41-30-440-001.
Install the HP compressor front cases in the IAE 1R18833 Half case container 1 off. Remove the lifters from the HP compressor front cases.
SUBTASK 72-41-30-440-252 Install the HP Compressor Front Cases in the Container
Figure: View Through the HP Compressor Front Case
View Through the HP Compressor Front Case

Figure: Remove the Stage 5 VSV Actuating Ring Bridge Pieces
Remove the Stage 5 VSV Actuating Ring Bridge Pieces

Figure: Remove the Stage 4 VSV Actuating Ring Bridge Pieces
Remove the Stage 4 VSV Actuating Ring Bridge Pieces

Figure: Remove the Stage 3 VSV Actuating Ring Bridge Pieces
Remove the Stage 3 VSV Actuating Ring Bridge Pieces

Figure: Remove the Inlet Guide Vane Actuating Ring Bridge Pieces
Remove the Inlet Guide Vane Actuating Ring Bridge Pieces

Figure: Remove the HP Compressor Front Case Split Line Nuts, Bolts and Spacers
Remove the HP Compressor Front Case Split Line Nuts, Bolts and Spacers