TASK 72-32-41-200-003 No. 1 Bearing Front Support - Examine, Inspection-003

DMC:V2500-A0-72-32-4103-00A-300A-C|Issue No:003.00|Issue Date:2016-08-01

Export Control

EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.

Copyright

© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).

Applicability

All

Common Information

TASK 72-32-41-200-003 No. 1 Bearing Front Support - Examine, Inspection-003

Effectivity

FIG/ITEM

PART NO.

01-300

5W2323

General

This TASK gives the procedure for the inspection of the No. 1 bearing front support assembly. For other No. 1 bearing support parts, refer to TASK 72-32-41-200-000 (INSPECTION-000).

Fig/item numbers in parentheses in the procedure agree with those used in the IPC.

The policy that is necessary for inspection is given in the SPM TASK 70-20-01-200-501.

All the parts must be cleaned before any part is examined. Refer to TASK 72-32-41-100-000 (CLEANING-000).

All parts must be visually examined for damage, corrosion and wear. Any defects that are not identified in the procedure must be referred to IAE.

Do not discard any part until you are sure there are no repairs available. Refer to the instructions in Repair before a discarded part is used again or oversize parts are installed.

Parts which should be discarded can be held although no repair is available. The repair of a discarded part could be shown to be necessary at a later date.

All parts must be examined to make sure that all the repairs have been completed satisfactorily.

The procedure for crack test is given in Step. Do the test before the part is visually examined.

The practices and processes referred to in the procedure by the TASK numbers are in the SPM.

References

Refer to the SPM for data on these items

Definitions of Damage, SPM TASK 70-02-02-350-501

Inspection of Parts, SPM TASK 70-20-00-200-501

Some data on these items are contained in this TASK. For more data on these items refer to the SPM

Method of Testing for Crack Indications

Chemical Processes

Surface Protection

NOTE

To identify the consumable materials, refer to the PCI.

Preliminary Requirements

Pre-Conditions

NONE

Support Equipment

NameManufacturerPart Number / IdentificationQuantityRemark
Magnetic particle inspection equipmentLOCALMagnetic particle inspection equipment

(Refer to SPM DMC-V2500-00-70-24-00-00A-352A-D)

Consumables, Materials and Expendables

NameManufacturerPart Number / IdentificationQuantityRemark
CoMat 06-011 MAGNETIC PARTICLES, FLUORESCENT, DRY POWDERLOCALCoMat 06-011

Spares

NONE

Safety Requirements

NONE

Procedure

    1. SUBTASK 72-32-41-240-054 Examine the No. 1 Bearing Front Support Assembly (01-300) for Cracks

    2. Clean the parts. Refer to TASK 72-32-41-100-000 (CLEANING-000).

      NOTE

      During magnetic inspection, it is recommended to use CoMat 06-011 MAGNETIC PARTICLES, FLUORESCENT, DRY POWDER.
      1. Do the crack test on the parts that are given below. Use the applicable magnetic inspection procedure.

        PART IDENT

        PROCEDURE

        CURRENT/INSPECT

        TASK/OP

        No. 1 bearing front support assembly

        TB using wet continuous or simultaneous inking with

        1000 AM

        No. 1 bearing front support assembly outside diameter visually inspect for longitudinal and radial defects. Check doubtful indication using low power magnification. If necessary, inspect under white light at X10 binocular

        Solenoid coil

        wet continuous

        or simultaneous inking

        6000 A/T

        Do again the magnetization and inspection along No. 1 bearing support length. Visually inspect for circumferential defects. Check doubtful indications using low power magnification. If necessary, inspect under white light at X10 binocular

        1. Cracked

        2. Reject unless referred to differently in the procedure

    1. SUBTASK 72-32-41-220-070 Examine the No. 1 Bearing Front Support Assembly (01-300) Surface

    2. Refer to Figure.

      1. Examine all the surface except oil seal mating surface at location 3.

        1. Nicked.

          1. Up to 0.005 in. (0.127 mm) in depth

          2. Accept

          1. More than Step

          2. Repair, VRS1960 TASK 72-32-41-300-012 (REPAIR-012)

        1. Dented.

          1. Up to 0.010 in. (0.254 mm) in depth

          2. Accept

          1. More than Step

          2. Repair, VRS1960 TASK 72-32-41-300-012 (REPAIR-012)

        1. Scratched.

          1. Up to 0.005 in. (0.127 mm) in depth

          2. Accept

          1. More than Step

          2. Repair, VRS1960 TASK 72-32-41-300-012 (REPAIR-012)

        1. Galled.

          1. Up to 0.005 in. (0.127 mm) in depth

          2. Accept

          1. More than Step

          2. Repair, VRS1960 TASK 72-32-41-300-012 (REPAIR-012)

      1. Examine the oil seal mating surface at location 3.

        1. High metal.

          1. High metal

          2. Repair, VRS1960 TASK 72-32-41-300-012 (REPAIR-012)

        1. Nicked.

          1. Up to 0.005 in. (0.127 mm) in depth

          2. Accept

          1. More than in Step

          2. Reject

        1. Dented.

          1. Up to 0.010 in. (0.254 mm) in depth

          2. Accept

          1. More than in Step

          2. Reject

        1. Scratched.

          1. Up to 0.005 in. (0.127 mm) in depth

          2. Accept

          1. More than in Step

          2. Reject

        1. Galled.

          1. Up to 0.005 in. (0.127 mm) in depth

          2. Accept

          1. More than in Step

          2. Reject

    1. SUBTASK 72-32-41-220-071 Examine the No. 1 Bearing Front Support Assembly (01-300) Clinch Nuts

    2. Refer to Figure.

      1. Examine the clinch nuts at locations 1.

        1. Thread damage

        2. Repair, VRS1961 TASK 72-32-41-300-018 (REPAIR-018)

        1. Loose

        2. Repair, VRS1961 TASK 72-32-41-300-018 (REPAIR-018)

        1. Missing

        2. Repair, VRS1961 TASK 72-32-41-300-018 (REPAIR-018)

    1. SUBTASK 72-32-41-220-072 Examine the No. 1 Bearing Front Support Assembly (01-300) Surface Paint

    2. Refer to Figure.

      1. Examine the surface paint at location 2.

        1. Peeled

        2. Repair, VRS1962 TASK 72-32-41-300-013 (REPAIR-013)

    1. SUBTASK 72-32-41-220-073 Examine the No. 1 Bearing Front Support Assembly (01-300) at Location 0301

    2. Refer to Figure.

      1. Dimensionally examine the average diameter.

        1. If the average diameter is between 12.7926 in. to 12.7936 in. (324.934 mm to 324.959 mm).

        2. Accept.

        1. Other than Step.

        2. Reject.

    1. SUBTASK 72-32-41-220-074 Examine the No. 1 Bearing Front Support Assembly (01-300) at Location 0320

    2. Refer to Figure.

      1. Dimensionally examine the average diameter.

        1. If the average diameter is between 16.2698 in. to 16.2723 in. (413.254 mm to 413.317 mm).

        2. Accept.

        1. If the average diameter is between 16.2698 in. to 16.2728 in. (413.254 mm to 413.329 mm).

        2. Accept the part for select fit only.

          NOTE

          This part can be used only if the mating part has a diameter that will result in a fit of reference No. 0320. Refer to TASK 72-32-41-440-001 (ASSEMBLY-001).
        1. Other than Step or Step.

        2. Reject.

    1. SUBTASK 72-32-41-220-075 Examine the No. 1 Bearing Front Support Assembly (01-300) at Location 0321

    2. Refer to Figure.

      1. Dimensionally examine the average diameter.

        1. If the average diameter is between 16.2071 in. to 16.2109 in. (411.660 mm to 411.757 mm).

        2. Accept.

        1. Other than Step.

        2. Reject.

  1. Figure: Inspection of the No. 1 Bearing Front Support Assembly

    Inspection of the No. 1 Bearing Front Support Assembly

Requirements After Job Completion

Follow-On Conditions

NONE
Change Type:

Deleted a step in general information and corrected the metric conversions. (87VJ805I, 87VJ805J, 87VJ805K)

Manufacturer Code:LOCAL
Enterprise Name:LOCALLY SUPPLIED
Manufacturer Code:X222X
Supply Number:CoMat 06-011
Type:sp01
Supply Short Name:CoMat 06-011 MAGNETIC PARTICLES, FLUORESCENT, DRY POWDER
Supply Name:CoMat 06-011 MAGNETIC PARTICLES, FLUORESCENT, DRY POWDER
Specification Groups:
Doc NumberType
Where CoMat 06-011 is specified with no suffix, use one of the CoMat 06-011 letter suffix alternative materials.
Suppliers:
ManufacturerRemarks
X222X
Manufacturer Code:LOCAL
Tool Number:Magnetic particle inspection equipment
Tool Name:Magnetic particle inspection equipment