Export Control
EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
V2500-A1 and Post SBE 72-0063
Common Information
TASK 72-00-50-420-001-B00 LPT Module - Install The LPT Module (Horizontal) - Method 1, Installation-002 - SBE 72-0063
General
This TASK gives the procedure to install the LP Turbine Module in horizontal position. Other related TASKS are:
Install the LP Turbine Module without TEC by TASK 72-00-50-420-002 (INSTALLATION-003).
Install the LP Turbine Module (vertical) by TASK 72-00-50-420-004-B00 (INSTALLATION-005) - Method 2.
Turn the LP Turbine Module from horizontal to vertical (front end down) by TASK 72-00-50-560-001 (REMOVAL-003).
Fig/item numbers in parentheses in this procedure agree with those used in the IPC. Only the primary Fig/item numbers are used. For the service bulletin alpha variants refer to the IPC.
For all parts identified in a different Chapter/Section/Subject, the applicable Chapter/Section/Subject comes before the Fig/item number.
For standard torque data and procedures, refer to the SPM TASK 70-41-01-400-501 and SPM TASK 70-41-02-400-501.
The number for each radial location must be identified in a clockwise direction. These start at the engine top position when you look from the rear of the engine, unless stated differently in the procedure.
Special torque data is identified by the symbol * after the torque value.
Special assembly tolerances are included in this procedure.
Lubricate all threads and abutment faces of nuts and bolts with CoMat 10-077 APPROVED ENGINE OILS, unless other lubricants are referred to in the procedure.
After assembly apply CoMat 07-038 AIR DRYING ENAMEL to any damaged surface protection, joint flanges and attach parts. Use the correct color of the air drying enamel. Refer to SPM TASK 70-63-02-400-501.
Transportation covers/blanks must be removed immediately before the installation of the components.
For lockwire data and procedures refer to the SPM TASK 70-42-05-400-501.
NOTE
NOTE
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| Dial Gage | LOCAL | Dial Gage | ||
| Vernier depth gage | LOCAL | Vernier depth gage | ||
| IAE 1F10016 Mechanical wrench | 0AM53 | IAE 1F10016 | 1 | |
| IAE 1F10026 Hydraulic hand pump | 0AM53 | IAE 1F10026 | 1 | |
| IAE 1F10052 Two cables sling | 0AM53 | IAE 1F10052 | 1 | |
| IAE 1F10058 Handling fixture | 0AM53 | IAE 1F10058 | 1 | |
| IAE 1F10063 Expanding retainer | 0AM53 | IAE 1F10063 | 1 | |
| IAE 1F10080 Horizontal stand | 0AM53 | IAE 1F10080 | 1 | |
| IAE 1F10084 Support fixture | 0AM53 | IAE 1F10084 | 1 | |
| IAE 2F10418 Length gage | 0AM53 | IAE 2F10418 | 1 | |
| IAE 2F10415 Loading fixture | 0AM53 | IAE 2F10415 | 1 | |
| IAE 2F10368 Plate, Vacuum check | 0AM53 | IAE 2F10368 | 1 | |
| IAE 6F10027 Heater control unit | 0AM53 | IAE 6F10027 | 1 | |
| IAE 6F10029 Air flow test cart | 0AM53 | IAE 6F10029 | 1 | |
| IAE 6F10030 Vacuum test cart | 0AM53 | IAE 6F10030 | 1 | |
| IAE 1J12220 Hydraulic pusher/puller | 0AM53 | IAE 1J12220 | 1 | |
| IAE 1J12221 Impact hammer | 0AM53 | IAE 1J12221 | 1 | |
| IAE 1J12243 Sizing sleeve | 0AM53 | IAE 1J12243 | 1 | |
| IAE 1J12259 Seal slider | 0AM53 | IAE 1J12259 | 1 | |
| IAE 1J12260 Spanner wrench | 0AM53 | IAE 1J12260 | 1 | |
| IAE 1J12279 Grinding fixture | 0AM53 | IAE 1J12279 | 1 | |
| IAE 1J12280 Guide bar | 0AM53 | IAE 1J12280 | 1 | |
| IAE 1J12281 0AM53 heater | 0AM53 | IAE 1J12281 | 1 | |
| IAE 1J12282 Expanding pliers | 0AM53 | IAE 1J12282 | 1 | |
| IAE 1J12522 Seal slider | 0AM53 | IAE 1J12522 | 1 | |
| IAE 1M14127 Support plate | 0AM53 | IAE 1M14127 | 2 | |
| IAE 1P16354 Vacuum Test Adapter | 0AM53 | IAE 1P16354 | 1 | |
| IAE 1P16624 Slide Puller | 0AM53 | IAE 1P16624 | 1 | |
| IAE 1P17523 Blank-off Plate | 0AM53 | IAE 1P17523 | 1 | |
| IAE 1R18908 Guide plug | 0AM53 | IAE 1R18908 | 1 | |
| IAE 2R18871 Inspection bridge | 0AM53 | IAE 2R18871 | 1 |
Consumables, Materials and Expendables
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| CoMat 01-119 POTASSIUM CHROMATE K2CrO4 | K6835 | CoMat 01-119 | ||
| CoMat 02-119 LOCKWIRE | LOCAL | CoMat 02-119 | ||
| CoMat 07-038 AIR DRYING ENAMEL | k3504 | CoMat 07-038 | ||
| CoMat 10-045 LEAK CHECK FLUID, BUBBLES-TYPE | 03530 | CoMat 10-045 | ||
| CoMat 10-045A LEAK CHECK FLUID, BUBBLES-TYPE | LOCAL | CoMat 10-045A | ||
| CoMat 10-077 APPROVED ENGINE OILS | LOCAL | CoMat 10-077 | ||
| CoMat 10-129 ANTI-SEIZE PASTE | 34568 | CoMat 10-129 |
Spares
| Name | Manufacturer | Part Number / Identification | Quantity | Remark |
|---|---|---|---|---|
| Sealing ring | 1 | |||
| Packing | 1 | |||
| Packing | 3 | |||
| Packing | 1 |
Safety Requirements
NONEProcedure
Examine the HP System Module at interface D-45. Refer to TASK 72-00-45-220-001 (INSPECTION-001).
Examine the front face of the LP Turbine Module at interface D-50/10. Refer to TASK 72-00-50-220-001 (INSPECTION-001).
Examine the LP Compressor/Intermediate Case Module at interface F-32. Refer to TASK 72-00-32-220-004 (INSPECTION-004).
Examine the LP Turbine Module at interface F-50. Refer to TASK 72-00-50-220-005 (INSPECTION-005).
SUBTASK 72-00-50-210-058 Examine the Module Interfaces
Refer to Figure.
Calculate the fit at Location 5624.
Table 1. Fits and Clearances (all dimensions are in inches) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Non-select)
REJECT IF
MORE THAN
LOCATION 5624
LP Turbine Case (72-50-21, 01-010), Bore
HP Turbine Stage 2 Support Case ENGINE-STAGE 2 HPT SUPPORT ASSEMBLY (72-45-27, 01-010), Diameter
LP Turbine Case Bore
28.527
28.533
Intf
0.002
28.527
28.533
Intf
0.002
HP System Case Diameter
28.535
28.541
0.014
28.529
28.541
0.014
Table 2. Fits and Clearances (all dimensions are in millimeters) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Non-select)
REJECT IF
MORE THAN
LOCATION 5624
LP Turbine Case (72-50-21, 01-010), Bore
HP Turbine Stage 2 Support Case ENGINE-STAGE 2 HPT SUPPORT ASSEMBLY (72-45-27, 01-010), Diameter
LP Turbine Case Bore
724.586
724.738
Intf
0.050
724.586
724.738
Intf
0.050
HP Turbine Case Diameter
724.789
724.941
0.356
724.637
724.941
0.356
SUBTASK 72-00-50-220-190 Measure that the Fits and Clearances between the LP Turbine Module and the HP System Module are in the Limits given at Location 5624
Refer to Figure.
Calculate the clearance at Location 5623.
Table 3. Fits and Clearances (all dimensions are in inches) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Select)
REJECT IF
MORE THAN
LOCATION 5623
Inner Duct Segment ENGINE-LP TURBINE INNER STATIC SEALS (72-50-24, 01-010), Honeycomb Surface
Stage 2 HPT Blade Retaining Plate ENGINE-STAGE 2 HPT BLADE RETAINING PLATE (72-45-33, 01-010) Knife Edge Outside Diameter
Inner Duct Segment Honeycomb Surface
19.896
19.925
0.118
Clear
19.896
19.925
0.118
Clear
Knife Edge Outside Diameter
19.807
19.812
Clear
0.084
19.797
19.812
Clear
0.084
Table 4. Fits and Clearances (all dimensions are in millimeters) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Select)
REJECT IF
MORE THAN
LOCATION 5623
Inner Duct Segment ENGINE-LP TURBINE INNER STATIC SEALS (72-50-24, 01-010), Honeycomb Surface
Stage 2 HPT Blade Retaining Plate ENGINE-STAGE 2 HPT BLADE RETAINING PLATE (72-45-33, 01-010), Knife Edge Outside Diameter
Inner Duct Segment Honeycomb Surface
505.36
506.10
3.00
Clear
505.36
506.10
3.00
Clear
Knife Edge Outside Diameter
503.10
503.22
Clear
2.13
502.84
503.22
Clear
2.13
SUBTASK 72-00-50-220-191 Measure that the Fits and Clearances between the LP Turbine Module and the HP System Module are in the Limits given at Location 5623 (Pre SBE 72-0028)
Refer to Figure.
Calculate the clearance at Location 5623.
Table 5. Fits and Clearances (all dimensions are in inches) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Select)
REJECT IF
MORE THAN
LOCATION 5623
Inner Duct Segment ENGINE-LP TURBINE INNER STATIC SEALS (72-50-24, 01-010), Honeycomb Surface
Stage 2 HPT Blade Retaining Plate ENGINE-STAGE 2 HPT BLADE RETAINING PLATE (72-45-33, 01-010), Knife Edge Outside Diameter
Inner Duct Segment Honeycomb Surface
19.896
19.925
0.121
Clear
19.896
19.925
0.121
Clear
Knife Edge Outside Diameter
19.804
19.812
Clear
0.084
19.797
19.812
Clear
0.084
Table 6. Fits and Clearances (all dimensions are in millimeters) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Select)
REJECT IF
MORE THAN
LOCATION 5623
Inner Duct Segment ENGINE-LP TURBINE INNER STATIC SEALS (72-50-24, 01-010), Honeycomb Surface
Stage 2 HPT Blade Retaining Plate ENGINE-STAGE 2 HPT BLADE RETAINING PLATE (72-45-33, 01-010), Knife Edge Outside Diameter
Inner Duct Segment Honeycomb Surface
505.36
506.10
3.07
Clear
505.36
506.10
3.07
Clear
Knife Edge Outside Diameter
503.02
503.22
Clear
2.13
502.84
503.22
Clear
2.13
SUBTASK 72-00-50-220-252 Measure the Fits and Clearances between the LP Turbine Module and the HP System Module are in the Limits given at Location 5623 (SBE 72-0028)
Refer to Figure.
Calculate the fit at Location 5620.
Table 7. Fits and Clearances (all dimensions are in inches) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Non-select)
REJECT IF
MORE THAN
LOCATION 5620
LP Stub Shaft (72-32-51, 01-350), Bore
LP Turbine Shaft ENGINE-LP TURBINE SHAFT (72-50-41, 01-200), Diameter
Stub Shaft Bore
3.5433
3.5447
Intf
0.0006
LP Turbine Shaft Diameter
3.5453
3.5462
0.0029
Table 8. Fits and Clearances (all dimensions are in millimeters) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Non-select)
REJECT IF
MORE THAN
LOCATION 5620
LP Stub Shaft (72-32-51, 01-350), Bore
LP Turbine Shaft ENGINE-LP TURBINE SHAFT (72-50-41, 01-200), Diameter
Stub Shaft Bore
90.000
90.035
Intf
0.016
LP Turbine Shaft Diameter
90.051
90.073
0.073
SUBTASK 72-00-50-220-192 Measure that the Fits and Clearances between the LP Turbine Module and the LP Compressor are in the Limits given at Location 5620
Refer to Figure.
Calculate the fit at Location 5621.
Table 9. Fits and Clearances (all dimensions are in inches) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Non-select)
REJECT IF
MORE THAN
LOCATION 5621
LP Stub Shaft (72-32-51, 01-350), Bore
LP Turbine Shaft ENGINE-LP TURBINE SHAFT (72-50-41, 01-200), Diameter
Stub Shaft Bore
3.9370
3.9379
Intf
0.0006
LP Turbine Shaft Diameter
3.9385
3.9393
0.0023
Table 10. Fits and Clearances (all dimensions are in millimeters) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Non-select)
REJECT IF
MORE THAN
LOCATION 5621
LP Stub Shaft (72-32-51, 01-350), Bore
LP Turbine Shaft ENGINE-LP TURBINE SHAFT (72-50-41, 01-200), Diameter
Stub Shaft Bore
100.000
100.022
Intf
0.015
LP Turbine Shaft Diameter
100.037
100.059
0.059
SUBTASK 72-00-50-220-193 Measure that the Fits and Clearances between the LP Turbine Module and the LP Compressor are in the Limits given at Location 5621.
Refer to Figure.
Calculate the clearance at Location 5622.
Table 11. Fits and Clearances (all dimensions are in inches) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Non-select)
REJECT IF
MORE THAN
LOCATION 5622
Differential Seal (72-32-26, 01-110), Bore
To LP Turbine Shaft ENGINE-LP TURBINE SHAFT (72-50-41, 01-200), Diameter
Seal Bore
3.9410
3.9449
0.0017
LP Turbine Shaft Diameter
3.9385
3.9393
0.0064
Table 12. Fits and Clearances (all dimensions are in millimeters) NEW PART
WORN PART
DIMENSIONS
DIMENSIONS
PART IDENT
Size
Clearance
(Non-select)
REJECT IF
MORE THAN
LOCATION 5622
Differential Seal (72-32-26, 01-110), Bore
LP Turbine Shaft ENGINE-LP TURBINE SHAFT (72-50-41, 01-200), Diameter
Seal Bore
100.100
100.200
0.041
LP Turbine Shaft Diameter
100.037
100.059
0.163
SUBTASK 72-00-50-220-194 Measure that the Fits and Clearances between the LP Turbine Module and the LP Compressor are in the Limits given at Location 5622.
Refer to Figure.
Install the IAE 1P16624 Slide Puller 1 off into No. 5 Bearing Packing Transfer Tube.
Move the knocker puller rearwards quickly and hit the handle to remove the No. 5 Bearing Packing Transfer Tube from the No. 5 Bearing Nozzle.
SUBTASK 72-00-50-420-391 Remove the No. 5 Bearing Nozzle
Refer to Figure.
Install the IAE 1F10052 Two cables sling 1 off to the IAE 1F10058 Handling fixture 1 off.
Install the IAE 1F10084 Support fixture 1 off to the IAE 1F10063 Expanding retainer 1 off.
Install the IAE 1F10063 Expanding retainer to the inner diameter of the LP Turbine Shaft. Attach the IAE 1F10084 Support fixture to the rear inner flange of the TEC.
Lift the IAE 1F10058 Handling fixture and install it to the IAE 1F10063 Expanding retainer. Align the guide pin of the IAE 1F10058 Handling fixture with the hole in the rear flange of the TEC.
Attach the IAE 1F10058 Handling fixture to the rear flange of the TEC with the 13 screws. Tighten the screws.

CAUTION
MAKE SURE THAT THE NUTS ARE TIGHTENED. IF THE FIXTURES ARE NOT CORRECTLY SECURED THE LP TURBINE CASE AND ROTOR PARTS CAN BE DAMAGED DURING HANDLING OF THE LP TURBINE MODULE.Attach the IAE 1F10063 Expanding retainer to the IAE 1F10058 Handling fixture with the two nuts. Tighten the nuts.
SUBTASK 72-00-50-420-245 Attach the LP Handling Fixture to the LP Turbine Module
Refer to Figure.
Connect the front shaft and the rear shaft of the IAE 2F10418 Length gage 1 off.
Compress the guiding slides of the front shaft and put the IAE 2F10418 Length gage from the rear in to the engine. Observe the top position of the front and the rear shaft.
Move the IAE 2F10418 Length gage in to the engine until the locating face of the front shaft touches the adjusting ring location on the LP Turbine Stub Shaft.
SUBTASK 72-00-50-420-246 Install the Length Gage in to the Engine
Refer to Figure.
Install the beam (part of the IAE 2F10418 Length gage) to the rear flange of the HP Turbine Case. Safety the beam to the HP Turbine Case with the eight bolts and nuts. The end of the rear shaft must be on the beam.
SUBTASK 72-00-50-420-247 Install the Beam of the Length Gage to the Rear Flange of the HP Turbine Case
Install the handle to the front end of the IAE 2F10418 Length gage 1 off.
Safety the handle to the IAE 2F10418 Length gage with the nut. Torque the nut to 521 lbfin (58.9 Nm).
SUBTASK 72-00-50-420-248 Install the Handle to the Length Gage
Refer to Figure.
Engage the IAE 1R18908 Guide plug to the inner flange of the LP Stub Shaft.
Align the four holes in the IAE 1R18908 Guide plug with the four holes in the inner flange of the LP Stub Shaft.
Safety the IAE 1R18908 Guide plug to the LP Stub Shaft with the four pins (parts of the IAE 1R18908 Guide plug).
Safety the four pins to the IAE 1R18908 Guide plug with the four screws (parts of the IAE 1R18908 Guide plug).
Install the force gage to the IAE 1R18908 Guide plug.
Attach with the socket head cap screw and nut (parts of the IAE 2F10415 Loading fixture).
Attach with the socket head cap screw and nut (parts of the IAE 2F10415 Loading fixture).
Install the IAE 1R18908 Guide plug 1 off with the force gage and the bolt (parts of the IAE 2F10415 Loading fixture 1 off) to the curvic coupling of the LP Stub Shaft as follows:
Install the flange (part of the IAE 2F10415 Loading fixture 1 off) to the front flange of the Fan Case. The bolt must come out through the center hole of the flange. Attach the flange to the Fan Case with eight screws, eight nuts and 16 washers.
Install the support (part of the IAE 2F10415 Loading fixture 1 off) to the bolt and the flange.
Install the thrust bearing (part of the IAE 2F10415 Loading fixture 1 off) on to the support. Safety all together with the ring and four screws.
Install the speed ball handle (part of the IAE 2F10415 Loading fixture 1 off). Attach it to the support with two screws.
SUBTASK 72-00-50-420-249 Install the Loading Fixture to the Front Flange of the Fan Case
Refer to Figure.
Turn the speed ball handle of the IAE 2F10415 Loading fixture 1 off until the force gage shows the load of 900 lbf (4.0 kN).
SUBTASK 72-00-50-420-250 Load the No. 1 Bearing
NOTE
Load must be applied in rearward direction.Refer to Figure.
Point the Dial Gage to the rear end of the IAE 2F10418 Length gage 1 off.
Read the Dial Gage and write down the dimension as dimension C.
Remove the Dial Gage.
SUBTASK 72-00-50-420-252 Measure the Dimension C
If the calculated dimension of T is out of the limits given in Figure. the applicable adjusting ring must be machined to calculated dimension T. Refer to Figure. Use the grinding machine and IAE 1J12279 Grinding fixture 1 off.
SUBTASK 72-00-50-420-254 Adjust the Thickness of the Adjusting Ring
Refer to Figure.
Disassemble the speed ball handle, the ring, the thrust bearing and the support (parts of the IAE 2F10415 Loading fixture).
Remove the bolt, the force gage and the IAE 1R18908 Guide plug V2500-A1 1 off from the curvic coupling of the LP Stub Shaft.
SUBTASK 72-00-50-420-255 Remove the Loading Fixture from the Engine
Refer to Figure.
Remove the IAE 2F10418 Length gage 1 off from the engine.
Disassemble the front shaft and the rear shaft of the IAE 2F10418 Length gage.
SUBTASK 72-00-50-420-256 Remove the Length Gage from the Engine
Remove the old adjusting ring from the LP Turbine Shaft and install the new adjusting ring. Use the IAE 1J12282 Expanding pliers 1 off.
SUBTASK 72-00-50-420-257 Install the Adjusting Ring to the LP Turbine Shaft
Install the IAE 1J12281 0AM53 heater to the front flange of the LP Turbine Stub Shaft.
Align the four holes in the guide of the IAE 1J12281 0AM53 heater with the four slots in the flange of the LP Stub Shaft.
Safety the guide of the IAE 1J12281 0AM53 heater to the LP Stub Shaft with the four pins.
Install IAE 1J12281 0AM53 heater 1 off to the stub shaft front flange as follows: Refer to Figure.
Install the guide ring A1 (part of IAE 1J12280 Guide bar) on to the lock nut at the rear flange of the Stage 2 Turbine Disk. Refer to Figure.
Connect the two IAE 1J12280 Guide bar (parts of the IAE 1J12280 Guide bar).
Install the connected IAE 1J12280 Guide bar with the conical end through the guide ring A1.
Make sure that the conical end of the IAE 1J12280 Guide bar is correctly engaged in to the IAE 1J12281 0AM53 heater.
Install the IAE 1J12280 Guide bar 1 off.
SUBTASK 72-00-50-420-258 Prepare the Engine for the Installation of the LP Turbine Module
Refer to Figure.
Attach the two IAE 1F10052 Two cables sling 1 off to the front spool of the IAE 1F10058 Handling fixture 1 off which is installed at the LP Turbine Module.
Loosen the nut of the eye bolt (part of the IAE 1F10080 Horizontal stand 1 off).
Loosen and remove the 28 hex head cap screws which attach the LP Turbine Module to the rear support of the IAE 1F10080 Horizontal stand.
Move the LP Turbine Module carefully to get it free from the IAE 1F10080 Horizontal stand. Lift the LP Turbine Module from the IAE 1F10080 Horizontal stand.
Loosen the ring nut C and remove the shaft (part of the IAE 1F10080 Horizontal stand) from the LP Turbine Shaft.
Install the shaft to the front support of the IAE 1F10080 Horizontal stand. Close the block and safety with the eye bolt and the nut.
Lift the LP Turbine Module to the same level as the IAE 1J12280 Guide bar installed in the engine before. Connect the LP Turbine Shaft front end to the IAE 1J12280 Guide bar.
SUBTASK 72-00-50-420-259 Remove the LP Turbine Module from the Horizontal Stand
Refer to Figure.
Remove the guide ring A1 and install the guide ring A3 (part of the IAE 1J12280 Guide bar 1 off) to the lock nut at the rear flange of the Stage 2 Turbine Disk.
SUBTASK 72-00-50-420-260 Remove the Guide Ring A1
Remove the guide ring A3 and install the guide ring A2 (part of the IAE 1J12280 Guide bar 1 off) to the lock nut at the rear flange of the Stage 2 Turbine Disk. Refer to Figure.
Push the IAE 1J12281 0AM53 heater 1 off backwards, until it is against the stop position. Increase the temperature of the spline area of the LP Stub Shaft to the temperature of 275 deg F to 329 deg F (135 deg C to 165 deg C). Use the IAE 6F10027 Heater control unit 1 off.
During this time remove the IAE 1M14127 Support plate 2 off from the LP Turbine Case front flange and the LP Turbine Shaft. Refer to Figure.
Pull the IAE 1J12281 0AM53 heater forwards. Move the LP Turbine Module in to the engine, until the LP Turbine Case front flange touches the HP Turbine Case rear flange. Refer to Figure.
Remove the IAE 1J12280 Guide bar.
Remove the four screws and the four pins from the guide of the IAE 1J12281 0AM53 heater.
Disengage the guide of the IAE 1J12281 0AM53 heater from the four slots in the flange of the LP Stub Shaft.
Remove the IAE 1J12281 0AM53 heater.
Remove the IAE 1J12281 0AM53 heater from the LP Stub Shaft front mounting flange.
Remove the IAE 1J12280 Guide bar from the LP Turbine Shaft Front End.
Install the inner subassembly of the IAE 1J12220 Hydraulic pusher/puller (which has the spanner, the plunger and the nut) in to the inner threaded hole of the LP Turbine Shaft.
NOTE
Make sure that the hydraulic connection of the hydraulic cylinder is at the opposite side of the cylinder.Attach the outer subassembly of the IAE 1J12220 Hydraulic pusher/puller (which has the guide, the cylinder and hydraulic cylinder) to the front flange of the LP Stub Shaft. The four flanges of the guide must be in line with the scallops of the LP Stub Shaft.
Install the IAE 1J12220 Hydraulic pusher/puller 1 off to the front flange of the LP Stub Shaft as follows: Refer to Figure.
Install the IAE 1F10026 Hydraulic hand pump 1 off to the hydraulic connection of the IAE 1J12220 Hydraulic pusher/puller.
Pull the LP Turbine Module in correct position. Tighten the work nut pairs at the HP/LP Turbine Flanges in opposite sequence. Apply equal force all around the flange to pull them together. In the same time operate the IAE 1F10026 Hydraulic hand pump stepwise to connect the LP Turbine Shaft with the LP Stub Shaft.
NOTE
Tighten the work nuts, and operate the IAE 1F10026 Hydraulic hand pump at the same time to prevent overloading of the IAE 1F10058 Handling fixture.If the HP/LP Turbine Flanges are together, loosen the two nuts which secure the IAE 1F10063 Expanding retainer 1 off to the IAE 1F10058 Handling fixture 1 off.

CAUTION
DO NOT SUPPLY THE HYDRAULIC PUSHER/PULLER WITH MORE THAN 5000 PSI (345 BAR) PRESSURE. TOO MUCH HYDRAULIC PRESSURE CAN CAUSE DAMAGE TO THE HYDRAULIC PUSHER/PULLER.Operate the IAE 1F10026 Hydraulic hand pump to make sure that the LP Turbine Shaft and the LP Stub Shaft are correctly engaged.
Disconnect the IAE 1F10026 Hydraulic hand pump from the IAE 1J12220 Hydraulic pusher/puller.
Loosen and remove the four screws which safety the pins to the guide of the IAE 1J12220 Hydraulic pusher/puller 1 off.
Remove the IAE 1J12220 Hydraulic pusher/puller from the LP Stub Shaft as follows: Refer to Figure.
Install the support B (part of the IAE 1J12260 Spanner wrench 1 off) to the retaining ring of the LP Compressor Disk. Attach the support B with the four bolts. Refer to Figure.
Install the support A (part of the IAE 1J12260 Spanner wrench) to the curvic coupling of the LP Stub Shaft. Attach the support A with the four bolts. Refer to Figure.
Install the drive bar and the drive coupling of the IAE 1J12260 Spanner wrench through the support. Engage the outside spanner teeth of the wrench on to the front lock nut of the LP Turbine Shaft.
Install the rod and the nut of the IAE 1J12260 Spanner wrench to the inner thread of the LP Turbine Shaft.
Assemble the IAE 1F10016 Mechanical wrench 1 off to the IAE 1J12260 Spanner wrench.
Install the turbine shaft front lock nut on to the front of the LP Turbine Shaft. Refer to Figure.
Remove the IAE 1F10016 Mechanical wrench from the IAE 1J12260 Spanner wrench.
Remove the tools as follows:
Safety the front lock nut of the LP Turbine Shaft with the locking cap and the Internal Retaining Ring ENGINE-LP TURBINE SHAFT (72-50-41, 01-100). Refer to Figure.

CAUTION
HOLD THE BOLTS IN THEIR POSITION IF YOU INSTALL THE NUTS ON TO THE BOLTS. DO NOT TURN THE BOLTS OR MAKE TO-AND-FRO MOVEMENTS. THE LP TURBINE CASE/HP TURBINE CASE FLANGE AND/OR THE BOLTS CAN BE DAMAGED.Torque the 84 nuts installed on the bolts which have their heads located on the HP Turbine Flange from 180.0 lbfin to 220.0 lbfin (20.0 Nm to 25.0 Nm).
Torque the 16 bolts which have their heads located on the LP Turbine Flange from 180.0 lbfin to 220.0 lbfin (20.0 Nm to 25.0 Nm) and safety the bolts with CoMat 01-119 POTASSIUM CHROMATE K2CrO4 lockwire.
Install the seven brackets and attach the 100 bolts and nuts which lock the LP Turbine Case to the HP Turbine Case. Refer to Figure.
SUBTASK 72-00-50-420-261 Install the LP Turbine Module
Refer to Figure.
Turn the knob clockwise to disengage the clamps of the IAE 1F10063 Expanding retainer 1 off.
Loosen and remove the 13 screws which attach the IAE 1F10058 Handling fixture 1 off to the rear flange of the TEC.
Remove the IAE 1F10058 Handling fixture from the IAE 1F10063 Expanding retainer.
Turn the handwheel of the IAE 1F10084 Support fixture 1 off clockwise to disengage the support from the LP Turbine Shaft.
Release the IAE 1F10084 Support fixture from the inner rear flange of the TEC. Remove the IAE 1F10084 Support fixture cover and the IAE 1F10063 Expanding retainer from the LP Turbine Module.
SUBTASK 72-00-50-420-262 Remove the Handling Fixture from the LP Turbine Module
Refer to Figure.
Install three new packings NO.5 BEARING OIL JET AND FILTER (72-58-02, 01-040) and the No. 5 Bearing Packing Transfer Tube in to the No. 5 Bearing Nozzle.
Install a new packing NO.5 BEARING OIL JET AND FILTER (72-58-02, 01-080) on to the bearing nozzle.
SUBTASK 72-00-50-420-392 Install the No. 5 Bearing Nozzle
Install the IAE 2F10415 Loading fixture 1 off on to the front flange of the Fan Case. Refer to Step and Figure.
Install the IAE 2R18871 Inspection bridge 1 off to the rear flange of the Turbine Exhaust Case.
Attach the IAE 2R18871 Inspection bridge with four nuts and bolts.
SUBTASK 72-00-50-420-263 Install the Loading Fixture and Inspection Bridge to the LP Turbine Module
Use a suitable Vernier depth gage to measure the dimension P (actual). Refer to Figure.
DIM.P to be within 13.7988 in. to 13.8421 in. (350.49 mm to 351.59 mm).
SUBTASK 72-00-50-420-264 Measure the Dimension P After the Installation of the LP Turbine Module
NOTE
Load must be applied in rearward direction.Remove the IAE 2F10415 Loading fixture 1 off from the front flange of the Fan Case. Refer to Step and Figure.
Remove the IAE 2R18871 Inspection bridge 1 off from the rear flange of the Turbine Exhaust Case.
SUBTASK 72-00-50-420-265 Remove the Loading Fixture and the Inspection Bridge from the LP Turbine Module
NOTE
Use of IAE 1J12259 Seal slider without IAE 1J12243 Sizing sleeve is not permitted.Put the blind cap ENGINE-LP TURBINE SHAFT (72-50-41, 01-150) with the rear end down on to a work bench.
Install the IAE 1J12259 Seal slider 1 off on the blind cap.
Lubricate the new ENGINE-LP TURBINE SHAFT (72-50-41, 01-160) sealing ring with CoMat 10-077 APPROVED ENGINE OILS.
Lubricate the outer diameter faces of the IAE 1J12259 Seal slider and the blind cap with CoMat 10-077 APPROVED ENGINE OILS.
Put the sealing ring on the IAE 1J12259 Seal slider. The open side of the sealing ring must be in down direction.
Remove the IAE 1J12259 Seal slider from the blind cap.
Extend the sealing ring and install it to the blind cap as follows. Refer to Figure.
Put the IAE 1J12243 Sizing sleeve 1 off with the front end down on to the work bench.
Lubricate the inner diameter face of the IAE 1J12243 Sizing sleeve and the outer diameter of the sealing ring with CoMat 10-077 APPROVED ENGINE OILS.
Put the blind cap in to the IAE 1J12243 Sizing sleeve. Diaphragm of the blind cap must be in down direction. Refer to Figure position A.
Slowly push down the blind cap until it touches the work bench. Refer to Figure position B.
Keep the blind cap in the IAE 1J12243 Sizing sleeve for ten or more minutes.
Remove the IAE 1J12243 Sizing sleeve from the blind cap.

CAUTION
DO NOT INSTALL THE BLIND CAP AND THE SEALING RING IN TO THE LP TURBINE SHAFT BEFORE B.(6). THE SEALING RING DIAMETER IS EXTENDED. THE LP TURBINE SHAFT BORE CAN CAUSE DAMAGE TO THE EXTENDED SEALING RING.Make the sealing ring diameter smaller as follows. Refer to Figure.

CAUTION
DO NOT CORRECT TWISTED CONDITION OF THE SEALING RING. DISCARD THE TWISTED SEALING RING.Make sure that the sealing ring is not twisted. Refer to Figure.
Examine the sealing ring.
Install the blind cap to the LP Turbine Shaft. Use the IAE 1J12221 Impact hammer 1 off.
NOTE
For fits and clearances refer to TASK 72-00-50-420-003-C00 (INSTALLATION-004, CONFIG-003),Install the Internal Retaining Ring ENGINE-LP TURBINE SHAFT (72-50-41, 01-100). Refer to Figure.
SUBTASK 72-00-50-420-266-B00 Install the Blind Cap to the LP Turbine Shaft (SBE 72-0037 and Pre SBE 72-0027)
SBE 72-0037: Replacement of the LP Turbine Shaft Rear End Sealing Ring
Install the IAE 1J12522 Seal slider 1 off on the blind cap.
Lubricate the sealing ring with CoMat 10-077 APPROVED ENGINE OILS.
Lubricate the outer diameter face of the IAE 1J12522 Seal slider and the blind cap with CoMat 10-077 APPROVED ENGINE OILS.
Put the sealing ring on the IAE 1J12522 Seal slider. The open side of the sealing ring must be in up direction.
Remove the IAE 1J12522 Seal slider from the blind cap.
Install the new ENGINE-LP TURBINE SHAFT (72-50-41, 01-160) sealing ring to the blind cap ENGINE-LP TURBINE SHAFT (72-50-41, 01-150) as follows, refer to Figure:

CAUTION
DO NOT CORRECT TWISTED CONDITION OF THE SEALING RING. DISCARD THE TWISTED SEALING RING.Make sure that the sealing ring is not twisted. Refer to Figure.
Examine the sealing ring.
Install the blind cap on to the LP Turbine Shaft. Use the IAE 1J12221 Impact hammer 1 off.

CAUTION
DO NOT USE THE INTERNAL RETAINING RING P/N RR295 WITH THE BLIND CAP P/N 5A1703.Install the Internal Retaining Ring ENGINE-LP TURBINE SHAFT (72-50-41, 01-100). Refer to Figure.
SUBTASK 72-00-50-420-266-D00 Install the Blind Cap to the LP Turbine Shaft (SBE 72-0227)
SBE 72-0227: Provide a new blind cap with decreased seal land height
Refer to Figure.
Install a new packing ENGINE-NO.5 BEARING COMPARTMENT COVER (72-58-01, 20-160) on to the No. 5 Bearing Compartment Cover ENGINE-NO.5 BEARING COMPARTMENT COVER (72-58-01, 20-120).
Install the IAE 1P17523 Blank-off Plate 1 off to the No. 5 Bearing Outer Oil Feed Tube. Refer to Figure.
Install the IAE 1P16354 Vacuum Test Adapter 1 off to the No. 5 Bearing Oil Scavenge Tube Outlet with three bolts (part of the IAE 1P16354 Vacuum Test Adapter). Tighten the bolts. Refer to Figure.
Attach the hose on the IAE 6F10029 Air flow test cart 1 off to the IAE 1P16354 Vacuum Test Adapter.
Control the air pressure to the IAE 1P16354 Vacuum Test Adapter to 10 PSI (68.95 kPa).
Apply CoMat 10-045 LEAK CHECK FLUID, BUBBLES-TYPE or CoMat 10-045 LEAK CHECK FLUID, BUBBLES-TYPE around the cover and oil tube interfaces to check for leaks. Replace the seal of any leaking interface with a new seal.
Do a leak check of the compartment cover and oil tubes.
Install the No.5 Bearing Shields ENGINE-NO.5 BEARING COMPARTMENT COVER (72-58-01, 20-100) and ENGINE-NO.5 BEARING COMPARTMENT COVER (72-58-01, 20-080) on to the cover. Align the boltholes.
Treat threads and underside of head of the bolts with CoMat 10-129 ANTI-SEIZE PASTE at assembly.
SUBTASK 72-00-50-420-267 Install the No. 5 Bearing Compartment Cover
Make sure that the IAE 1P16354 Vacuum Test Adapter has no damage.
Lubricate the bolts, nuts and washers with CoMat 10-077 APPROVED ENGINE OILS.
Attach the IAE 1P16354 Vacuum Test Adapter to No. 5 Bearing Outer Oil Scavenge Tube and safety with 4 bolts. Torque the bolts to 85 lbfin to 105 lbfin (9.604 Nm to 11.863 Nm).
Install the IAE 1P16354 Vacuum Test Adapter 1 off to No. 5 Bearing Outer Oil Scavenge Tube, Figure.
Make sure that the IAE 1P17523 Blank-off Plate has no damage.
Lubricate the bolts, nuts and washers with CoMat 10-077 APPROVED ENGINE OILS.
Attach the IAE 1P17523 Blank-off Plate to No. 5 Bearing Outer Oil Feed and safety with 3 bolts. Torque the bolts to 85 lbfin to 105 lbfin (9.60 Nm to 11.86 Nm).
Install the IAE 1P17523 Blank-off Plate 1 off to No. 5 Bearing Outer Oil Feed Tube, Figure.
SUBTASK 72-00-50-420-268 Install the Adapter and the Plate to the Turbine Exhaust Case
Refer to Figure.
Connect the hose of IAE 6F10030 Vacuum test cart 1 off to the nipple of the IAE 1P16354 Vacuum Test Adapter 1 off. Refer to Figure.
Attach the cart vacuum gage hose to the plug of the IAE 1P16354 Vacuum Test Adapter.
NOTE
Refer to the manufacturer's manual for the operation of the IAE 6F10030 Vacuum test cart.Set the air pressure at the test port to -20inHg (-508 mmHg gage). Based on the ambient pressure, refer to the table below for the vacuum pressure in psia.
Ambient pressure of the Day (psia)
Vacuum Pressure (psia)
14.7
4.9
14.5
4.7
14.3
4.5
14.1
4.3
13.9
4.1
13.7
3.9
13.5
3.7
13.3
3.5
13.1
3.3
Vacuum pressure (psia) = Ambient pressure of the day (psia) - 9.8 psia
Read the airflow indicated by the rotor meters on the IAE 6F10030 Vacuum test cart.
SUBTASK 72-00-50-420-269 Do an Evacuation Check for the No. 5 Bearing Compartment
Disconnect the hoses of the IAE 6F10030 Vacuum test cart from the adapter. Refer to Figure.
SUBTASK 72-00-50-420-270 Remove the Vacuum Test Cart, the Adapter and the Plate
Install the Module Dressings. Refer to TASK 72-00-50-420-005 (INSTALLATION-007).
SUBTASK 72-00-50-420-271 Install the Module Dressings
Install the Inlet Cone. Refer to TASK 72-38-11-420-001 (INSTALLATION-001).
SUBTASK 72-00-50-420-272 Install the Inlet Cone
Figure: Fits and Clearances at Interface D-45 and D-50/10
Fits and Clearances at Interface D-45 and D-50/10

Figure: Fits and Clearances at Interface F-32 and F-50
Fits and Clearances at Interface F-32 and F-50

Figure: Attachment of the Handling Fixture and the Expanding Retainer
Attachment of the Handling Fixture and the Expanding Retainer

Figure: Installation of the Heater and the Guide Bar
Installation of the Heater and the Guide Bar

Figure: Installation of the Guide Rings
Installation of the Guide Rings

Figure: Calculate the Adjusting Ring Thickness
Sheet 1

Figure: Calculate the Adjusting Ring Thickness
Sheet 2

Figure: Calculate the Adjusting Ring Thickness
Sheet 3

Figure: Calculate the Adjusting Ring Thickness
Sheet 4

Figure: Calculate the Adjusting Ring Thickness
Sheet 5

Figure: Example of a Component Dimension Record Sheet
Sheet 1

Figure: Example of a Component Dimension Record Sheet
Sheet 2

Figure: Example of a Component Dimension Record Sheet
Sheet 3

Figure: Example of a Component Dimension Record Sheet
Sheet 4

Figure: Connect the LP Shaft Front End with the LP Stub Shaft
Connect the LP Shaft Front End with the LP Stub Shaft

Figure: Install the LP Turbine Shaft Front Lock Nut
Sheet 1

Figure: Install the LP Turbine Shaft Front Lock Nut
Sheet 2

Figure: Safety the Front Lock Nut of the LP Turbine Shaft
Safety the Front Lock Nut of the LP Turbine Shaft

Figure: Removal of the Support Plate
Removal of the Support Plate

Figure: Pre SBE 75-0013 Installation of the Bolts and the Brackets at the LP Turbine Module Front Flange
Sheet 1

Figure: Pre SBE 75-0013 Installation of the Bolts and the Brackets at the LP Turbine Module Front Flange
Sheet 2

Figure: SBE 75-0013 Installation of the Bolts and the Brackets at the LP Turbine Module Front Flange
Sheet 3

Figure: SBE 75-0013 Installation of the Bolts and the Brackets at the LP Turbine Module Front Flange
Sheet 4

Figure: Installation of the No.5 Bearing Compartment Cover
Installation of the No.5 Bearing Compartment Cover

Figure: Install the Blind Cap
Install the Blind Cap

Figure: Remove the LP Turbine Module from the Horizontal Stand
Sheet 1

Figure: Remove the LP Turbine Module from the Horizontal Stand
Sheet 2

Figure: Installation of the Adapter to No.5 Bearing Outer Oil Scavenge Tube
Installation of the Adapter to No.5 Bearing Outer Oil Scavenge Tube

Figure: Installation of the Plate to No.5 Bearing Outer Oil Feed Tube
Installation of the Plate to No.5 Bearing Outer Oil Feed Tube

Figure: Connect the Fitting of the Vacuum Test Cart to the Adapter
Connect the Fitting of the Vacuum Test Cart to the Adapter

Figure: Install/Remove the Loading Fixture
Install/Remove the Loading Fixture

Figure: SBE 72-0037 and Pre SBE 72-0227: Installation of the Sealing Ring on to the Blind Cap
Sheet 1

Figure: SBE 72-0227: Installation of the Sealing Ring on to the Blind Cap
Sheet 2

Figure: Installation of the Sealing Ring on to the Blind Cap - Method 2
Sheet 3

Figure: SBE 72-0037 and Pre SBE 72-0227: Installation of the Sealing Ring in to the Sizing Sleeve
SBE 72-0037 and Pre SBE 72-0227: Installation of the Sealing Ring in to the Sizing Sleeve

Figure: SBE 72-0037: Installed Condition of the Sealing Ring
SBE 72-0037: Installed Condition of the Sealing Ring

Figure: Example of Incorrect Installation of the Sealing Ring onto the Blind Cap
Example of Incorrect Installation of the Sealing Ring onto the Blind Cap

Figure: SBE 72-0037: Installation of Blind Cap and Retaining Ring
SBE 72-0037: Installation of Blind Cap and Retaining Ring

Figure: Install the No.5 Bearing Nozzle
Install the No.5 Bearing Nozzle