EAR Export Classification: Not subject to the EAR per 15 C.F.R. Chapter 1, Part 734.3(b)(3), except for the following Service Bulletins which are currently published as EAR Export Classification 9E991: SBE70-0992, SBE72-0483, SBE72-0580, SBE72-0588, SBE72-0640, SBE73-0209, SBE80-0024 and SBE80-0025.Copyright
© IAE International Aero Engines AG (2001, 2014 - 2021) The information contained in this document is the property of © IAE International Aero Engines AG and may not be copied or used for any purpose other than that for which it is supplied without the express written authority of © IAE International Aero Engines AG. (This does not preclude use by engine and aircraft operators for normal instructional, maintenance or overhaul purposes.).Applicability
All
Common Information
TASK 72-45-00-200-005 HP Turbine (HPT) Rotor And Stator Assembly - Examine The HPT After Possible Titanium Ignition Event, Inspection-005
General
This TASK gives the procedure for the procedure for the inspection of the HPT after a possible titanium ignition event.
The policy that is necessary for inspection is given in SPM TASK 70-20-00-200-501.
Preliminary Requirements
Pre-Conditions
NONESupport Equipment
NONEConsumables, Materials and Expendables
NONESpares
NONESafety Requirements
NONEProcedure
Refer to TASK 72-45-32-200-001-A00 (INSPECTION-001, CONFIG-001), TASK 72-45-32-200-001-B00 (INSPECTION-001, CONFIG-002) and TASK 72-45-32-200-001-C00 (INSPECTION-001, CONFIG-003)
Refer to Repair, VRS3711 TASK 72-45-32-300-027 (REPAIR-027) or VRS3713 TASK 72-45-32-300-028 (REPAIR-028)
Do an airflow check on HPT Stage 2 blade assembly
If the HPT Stage 2 blades passed inspection, do an Airflow Check on HPT Stage 2 Blade Assembly.
Examine the Stage 2 HPT Blade Assembly
Refer to TASK 72-45-14-200-001-A00 (INSPECTION-001, CONFIG-001), TASK 72-45-14-200-001-B00 (INSPECTION-001, CONFIG-002), TASK 72-45-14-200-001-C00 (INSPECTION-001, CONFIG-003) and TASK 72-45-14-200-001-D00 (INSPECTION-001, CONFIG-004)
Reject Stage 2 HPT air seal but not before you examine it by Step of this procedure
If the blade root has experienced overtemperature
Refer to Repair, VRS3710 TASK 72-45-14-300-031 (REPAIR-031) or VRS3712 TASK 72-45-32-300-026 (REPAIR-026)
Do an airflow check on the HPT Stage 1 blades
Examine Stage 1 HPT blades
Refer to TASK 72-44-20-200-001-A01 (INSPECTION-001, CONFIG-001) and TASK 72-44-20-200-001-B01 (INSPECTION-001, CONFIG-002)
Examine the Stage 1 HPT Vane Assembly
Refer to TASK 72-45-24-200-002-A00 (INSPECTION-002, CONFIG-001), TASK 72-45-24-200-002-B00 (INSPECTION-002, CONFIG-002), TASK 72-45-24-200-002-C00 (INSPECTION-002, CONFIG-003), TASK 72-45-24-200-002-D00 (INSPECTION-002, CONFIG-004), TASK 72-45-24-200-002-E00 (INSPECTION-002, CONFIG-005), TASK 72-45-24-200-002-F00 (INSPECTION-002, CONFIG-006) and TASK 72-45-24-200-002-G00 (INSPECTION-002, CONFIG-007)
Examine the Stage 2 HPT Ring Segment and Vane Clusters
Refer to TASK 72-45-23-200-004-A00 (INSPECTION-004, CONFIG-001), TASK 72-45-23-200-004-B00 (INSPECTION-004, CONFIG-002), TASK 72-45-23-200-004-C00 (INSPECTION-004, CONFIG-003) and TASK 72-45-23-200-004-D00 (INSPECTION-004, CONFIG-004)
Examine the Stage 1 HPT Duct Segments if it was not rejected before
Refer to TASK 72-45-23-200-001-A00 (INSPECTION-001, CONFIG-001), TASK 72-45-23-200-001-B00 (INSPECTION-001, CONFIG-002) and TASK 72-45-23-200-001-C00 (INSPECTION-001, CONFIG-003)
Examine the Stage 1 HPT Band Segments if they have not been rejected before
Refer to TASK 72-45-22-200-001-A00 (INSPECTION-001, CONFIG-001), TASK 72-45-22-200-001-B00 (INSPECTION-001, CONFIG-002) and TASK 72-45-22-200-001-C00 (INSPECTION-001, CONFIG-003)
Examine the Stage 1 Duct Support if it has not been rejected before
Refer to TASK 72-45-33-200-001-A00 (INSPECTION-001, CONFIG-001), TASK 72-45-33-200-001-B00 (INSPECTION-001, CONFIG-002)
If not rejected before, examine the Stage 2 HPT blade retaining plate
Refer to TASK 72-45-12-200-001-A00 (INSPECTION-001, CONFIG-001), TASK 72-45-12-200-001-B00 (INSPECTION-001, CONFIG-002), TASK 72-45-12-200-001-C00 (INSPECTION-001, CONFIG-003) and TASK 72-45-12-200-001-D00 (INSPECTION-001, CONFIG-004)
If not rejected before, examine the Stage 1 HPT air seal (outer)
Refer to TASK 72-45-00-200-002-A00 (INSPECTION-002, CONFIG-001), TASK 72-45-00-200-002-B00 (INSPECTION-002, CONFIG-002), TASK 72-45-00-200-002-C00 (INSPECTION-002, CONFIG-003), TASK 72-45-00-200-002-D00 (INSPECTION-002, CONFIG-004), TASK 72-45-00-200-002-E00 (INSPECTION-002, CONFIG-005), TASK 72-45-00-200-002-F00 (INSPECTION-002, CONFIG-006), TASK 72-45-00-200-002-G00 (INSPECTION-002, CONFIG-007), TASK 72-45-00-200-002-H00 (INSPECTION-002, CONFIG-008) and TASK 72-45-00-200-002-I00 (INSPECTION-002, CONFIG-009)
Refer to TASK 72-45-11-200-001-A00 (INSPECTION-001, CONFIG-001), TASK 72-45-11-200-001-B00 (INSPECTION-001, CONFIG-002), TASK 72-45-11-200-001-C00 (INSPECTION-001, CONFIG-003) and TASK 72-45-11-200-001-D00 (INSPECTION-001, CONFIG-004)
Examine the Stage 1 turbine hub
Refer to TASK 72-45-11-200-002 (INSPECTION-002)
Examine the Stage 1 turbine hub
If it has not been rejected before, examine the Stage 1 turbine hub.
Refer to TASK 72-45-31-200-001-A00 (INSPECTION-001, CONFIG-001), TASK 72-45-31-200-001-B00 (INSPECTION-001, CONFIG-002), TASK 72-45-31-200-001-C00 (INSPECTION-001, CONFIG-003), TASK 72-45-31-200-001-D00 (INSPECTION-001, CONFIG-004) and TASK 72-45-31-200-001-E00 (INSPECTION-001, CONFIG-005)
Examine the Stage 2 turbine hub
Refer to TASK 72-45-31-200-004 (INSPECTION-004)
Examine the Stage 2 turbine hub
Refer to TASK 72-45-31-200-005-A00 (INSPECTION-005, CONFIG-001)
Examine the Stage 2 turbine hub
If it has not been rejected before, examine the Stage 2 turbine hub.
Examine the Stage 2 HPT air seal
Refer to TASK 72-45-13-200-001-A00 (INSPECTION-001, CONFIG-001), TASK 72-45-13-200-001-B00 (INSPECTION-001, CONFIG-002), TASK 72-45-13-200-001-C00 (INSPECTION-001, CONFIG-003), TASK 72-45-13-200-001-D00 (INSPECTION-001, CONFIG-004), TASK 72-45-13-200-001-E00 (INSPECTION-001, CONFIG-005), TASK 72-45-13-200-001-F00 (INSPECTION-001, CONFIG-006), TASK 72-45-13-200-001-G00 (INSPECTION-001, CONFIG-007)
If it has not been rejected before, examine the Stage 1 HPT air seal
Do an inspection of all life limited parts. Report unusual findings or out of limit dimensions to IAE Technical Services. Reject parts if there is molten debris.
SUBTASK 72-45-00-220-230 Examine HPT After Possible Titanium Ignition Event